logo

KRMC Inpatient Wing BP2

Sector: Hotel • Location: Kearney, Nebraska, United States of America

Source: Dodge USA

Project
Closed

The Project consists of the construction of a 2-story Inpatient Wing totaling approximately 37,000sf, a separate Staff Corridor on the South End of Campus totaling approximately 1,800sf, and two additional Parking Lots on Campus. The components of this Bid Package shall include, but are not limited to the following items; Selective Demolition, Structural and Miscellaneous Steel to include Stairs,

Status
Closed
Sector
Hotel, Metal, Car parking, Steel, Hospital, Automotive, Commercial, Manufacturing (Industrial)
Location
Kearney, Nebraska, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about KRMC Inpatient Wing BP2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “KRMC Inpatient Wing BP2” is an infrastructure initiative in the Hotel sector, located in Kearney, Nebraska, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project consists of the construction of a 2-story Inpatient Wing totaling approximately 37,000sf, a separate Staff Corridor on the South End of Campus totaling approximately 1,800sf, and two additional Parking Lots on Campus. The components of this Bid Package shall include, but are not limited to the following items; Selective Demolition, Structural and Miscellaneous Steel to include Stairs, Cold-Formed Metal Framing, Rough Carpentry, Finish Carpentry, Architectural Wood Casework, Sheet ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Nebraska

City

Kearney

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Hotel, Metal, Car parking, Steel, Hospital, Automotive, Commercial, Manufacturing (Industrial)

Article published date

2024-07-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project