logo

Kronospan OSB project

Sector: Natural Gas • Location: Russia

Source: European Bank for Reconstruction and Development (EBRD)

Project
Complete

Translated version of this PSD: Russian The EBRD is considering to provide a long-term corporate loan to Kronospan to finance construction of a new manufacturing line for Oriented Strand Board (“OSB”) at the company’s manufacturing facility in Egorievsk, Moscow region, in order to broaden its product range in Russia and to meet growing consumer demand. The transition impact potential of the transa

Project Information FAQ

Project Information

3 Q
The project “Kronospan OSB project” is an infrastructure initiative in the Natural Gas sector, located in Russia. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Translated version of this PSD: Russian The EBRD is considering to provide a long-term corporate loan to Kronospan to finance construction of a new manufacturing line for Oriented Strand Board (“OSB”) at the company’s manufacturing facility in Egorievsk, Moscow region, in order to broaden its product range in Russia and to meet growing consumer demand. The transition impact potential of the transaction derives from the following sources: OOO Kronospan - a fully-owned subsidiary of Kronospan Holdings East Ltd Cyprus, which holds CIS assets of Kronospan group. The Kronospan group of companies is a world leader in wood-based panel manufacturing. The Bank will provide a long-term EUR 120 million corporate loan to OOO Kronospan. The Bank is aiming at syndicating up to EUR 40 million of the Loan amount to commercial banks. Total estimated cost of the OSB plant is EUR 163.1 million. Categorised B in accordance with the EBRD Environmental and Social Policy (2008). Potential adverse future environmental and social impacts of the construction and operation of a new OSB line with the capacity of 300,000 m3/a to be extended to500,000 m3/a within an existing industrial complex with particleboard, MDF and resin production are site-specific and readily mitigated through introduction of modern production technology and appropriate management and mitigation measures as well as ensuring the wood raw material for the OSB production is of legal and sustainable origin. An environmental and social review of the Company’s existing MDF, particleboard and resin production facilities and operations was undertaken based on the Company’s regular reporting on its environmental and social performance and site visit conducted by ESD specialist. The review showed that the Company is currently in full compliance with the environmental and social provisions of EBRD financing agreements and Performance Requirements (PRs). The production facilities are operating in accordance with the design parameters and the environmental impacts are within allowable limits. The Company is actively engaged with the community and is regularly releasing information on its operations. The Company has diligently implemented sustainable wood procurement procedures required by the Bank and obtained FSC Chain-of-Custody (CoC) and Controlled Wood (CW) certifications for its wood supply management system in June 2010. Environmental and social due diligence assessing the incremental environmental and social impacts arising from the construction and operation of the new OSB line has concluded that the OSB line will fully meet relevant EU environmental standards and good international practice, including Best Available Techniques (BAT). The direct environmental and social impacts during the construction and the operation of the OSB line will be limited and efficiently mitigated with BAT and design solutions. The air emissions, including those of dust and formaldehyde, will meet EU and international BAT emission standards and the ambient concentrations of these pollutants at the perimeter of the mill are expected to remain several times below the Russian limit values. All industrial and cooling water will be circulated in closed loops and no industrial wastewater will be generated. Bark and other wood wastes will be used as fuel in biomass boiler providing heat and steam to substitute the use of natural gas. The OSB products will be E1 classified in accordance with international standards for free formaldehyde content in the final products, ensuring that the OSB boards can be safely used without causing elevated concentrations of formaldehyde in indoor air. The OSB plant will use up to 1.1 million m3 per year of round wood and the total wood consumption of the particleboard, MDF and OSB production lines will be 3.7 million m3/a. The Company does not hold any leased forest areas and is fully relying on external wood supplies. To mitigate the adverse impact of the wood procurement and to ensure the wood supplied to the mill is of legal and sustainable origin, the Company will control and manage its external wood suppliers in accordance with FSC CoC and CW criteria and is committed to give preference to FSC certified wood when available. The Company has assigned an external environmental consultant to prepare technical-economic assessment of the investment (TEO) and assessment of impacts on the environment (OVOS) in compliance with Russian permitting requirements, according to which the project will be subject to formal public disclosure and public hearings. The Company is systematically monitoring and reporting its environmental, social and health and safety impacts to ascertain compliance with Russian and international environmental standards, including BAT for the industry sector. The EBRD will evaluate the project's compliance with the applicable environmental and social requirements and the Bank’s PRs during the lifetime of the project through annual reporting by the Company and periodic supervision visits. None. Kronospan Contact : Sabine Smith Tel: + 44 1691 775 306 Email: s.smith@kronospan.co.uk Website: www.kronospan-worldwide.com

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data