KS/DOT: K-5 Offset Alignment Study
Sector: Water Supply and Storage • Location: Leavenworth, Kansas, United States of America
Source: Dodge
This project will identify offset alignment options for the reconstruction of 10 miles of K-5, between US-73 and I-435. It includes the removal and replacement of four (4) bridges and two (2) bridge class RCB's. Services associated with this RFP are for Discovery Phase only, with an option to continue the contract through Final Design. Bridge 0105-B0232 Existing Structure - 130' (39'-52'-39') Rein
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project will identify offset alignment options for the reconstruction of 10 miles of K-5, between US-73 and I-435. It includes the removal and replacement of four (4) bridges and two (2) bridge class RCB's. Services associated with this RFP are for Discovery Phase only, with an option to continue the contract through Final Design. Bridge 0105-B0232 Existing Structure - 130' (39'-52'-39') Reinforced Concrete Slab Continuous & Haunched (RCSH) Scope: Replacement Bridge 0105-B0265 Existing S... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
