logo
ProjectPlanning Schematics

KS/DOT: K-55 Bridge Replacement

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

Replace bridges 117 and 118 on K-55 in Sumner County, K-55: bridge 117 over Arkansas River Drainage located 8.39 miles east of US-81 and bridge 118 over Antelope Creek located 9.20 miles east of US-81

Status
Prospective
Sector
Road, Bridge, Commercial, Waste Processing and Treatment
Location
Belle Plaine, Kansas, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about KS/DOT: K-55 Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “KS/DOT: K-55 Bridge Replacement” is an infrastructure initiative in the Road sector, located in Belle Plaine, Kansas, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

planning schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Replace bridges 117 and 118 on K-55 in Sumner County, K-55: bridge 117 over Arkansas River Drainage located 8.39 miles east of US-81 and bridge 118 over Antelope Creek located 9.20 miles east of US-81

Procurement method

Budget

Location

Country

United States of America (USA)

State

Kansas

City

Belle Plaine

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Road, Bridge, Commercial, Waste Processing and Treatment

Article published date

2025-07-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project