logo
ProjectConstruction Documents

KS/DOT: K-7 Bridge and Culvert Improvements

Construction documents · Kansas · Last reported Oct 2024

Source: Dodge USA

K-7: from the north city limits of Girard north to the Crawford/Bourbon county line (includes bridge #016 over Frisco Lake and Culvert #513 over Second Cow Creek Drainage) Scope: Rehabilitate, add shoulders, replace bridge and culvert. K-7: from the north city limits of Girard, north to 0.962 mile north of West 700th Avenue. Includes bridge #016 over Frisco Lake and culvert #510 and #512 over Seco

Status
Closed
Sector
Water Supply and Storage, Bridge, Waste Processing and Treatment, Commercial, Road
Location
Girard, Kansas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about KS/DOT: K-7 Bridge and Culvert Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “KS/DOT: K-7 Bridge and Culvert Improvements” is an infrastructure initiative in the Water Supply and Storage sector, located in Girard, Kansas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Construction Documents

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

K-7: from the north city limits of Girard north to the Crawford/Bourbon county line (includes bridge #016 over Frisco Lake and Culvert #513 over Second Cow Creek Drainage) Scope: Rehabilitate, add shoulders, replace bridge and culvert. K-7: from the north city limits of Girard, north to 0.962 mile north of West 700th Avenue. Includes bridge #016 over Frisco Lake and culvert #510 and #512 over Second Cow Creek Drainage

Procurement method

Budget

Location

Country

United States of America (USA)

State

Kansas

City

Girard

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Bridge, Waste Processing and Treatment, Commercial, Road

Article published date

2024-10-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project