KS/DOT: US 75 Bridge Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
GRADING, BRIDGE AND SURFACING. US-75: BR 087 (BNSF RR/K-276) LOC 3.5 MI N OF THE CF COLN AND BR 090 LOC 6.54 MI N OF THE CF COLN IN OS CO. LGTH IS 0.195 MI.
- Status
- Prospective
- Sector
- Commercial, Rail, Bridge, Mass Transit
- Location
- Kansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about KS/DOT: US 75 Bridge Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | GRADING, BRIDGE AND SURFACING. US-75: BR 087 (BNSF RR/K-276) LOC 3.5 MI N OF THE CF COLN AND BR 090 LOC 6.54 MI N OF THE CF COLN IN OS CO. LGTH IS 0.195 MI. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kansas |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Commercial, Rail, Bridge, Mass Transit |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
