KSE Orapa and Mmashoro IPP

Sector: Wind • Location: Botswana

Source: World Bank Group

Project
Active

The Orapa independent power plant was a project by Karoo Sustainable Energy (KSE), thad added 90MW to the national grid. It was one of two mid-merit or peaker power plants totalling 270MW in capacity. The other plant, 180MW, was located in Mmashoro. Both were to run off coal bed methane (CBM) produced at the coal mines of Kalahari Energy, which was a 50% steakholder in KSE. The other 50% of KSE wa

Project Information FAQ

Project Information

4 Q
The project “KSE Orapa and Mmashoro IPP” is an infrastructure initiative in the Wind sector, located in Botswana. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Orapa independent power plant was a project by Karoo Sustainable Energy (KSE), thad added 90MW to the national grid. It was one of two mid-merit or peaker power plants totalling 270MW in capacity. The other plant, 180MW, was located in Mmashoro. Both were to run off coal bed methane (CBM) produced at the coal mines of Kalahari Energy, which was a 50% steakholder in KSE. The other 50% of KSE was held by Turkish power company Tuten. KSE had finalised a 15-year power purchasing agreement with Botswana Power Corporation (BPC), to sell 100% of the power produced. 90MW of the power was to be produced at Orapa, and another 180MW at Mmashoro. The Orapa diamond mine was to use around 50MW of capacity. Mmashoro is the site of Kalahari's Energy's mines. The Orapa plant was to be a BOT, operated by KSE and owned by BPC, but KSE will own and operate the larger facility at Mmashoro. The Orapa turbine plant was officially handed over to Botswana Power Corporation by Debswana in October 2011. It was commissioned in August 2011. (Financial closure for February 2011, when most of the construction had been completed as the website showed). The project was completed for $104 million (Pula 710 million) against a budgeted $124 million (Pula 850 million). Debt financing was to come entirely from the private sector owners. N.B. The Orapa power station emerged from a tender awarded to KSE in 2008 for the development of a 250 MW CBM gas-fired power station. Following technical challenges, the original project did not materialise, resulting in restructuring of the project into the Orapa 90 MW and a 180 MW gas-fired power station to be developed by KSE in Mmashoro. Needs additional info on financing (US ExIm?) Sponsor info needs update (Karoo Sustainable Energy - KSE).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data