Ksi Lisims LNG Project
The owner, status and timeline of this project. A free account opens every field.
Source: Beritaja.com
The $20 billion Ksi Lisims LNG project will be located about 100 km north of Prince Rupert and will be powered through the BC Hydro grid. It is a joint venture between the Nisga'a First Nation, Texas-based Western LNG, and Rockies LNG Limited. The project is expected to create 800 jobs during construction and more than 200 ongoing jobs at the site, contributing $17 billion in revenue to the Canadi
- Status
- Prospective
- Sector
- Hydro, Natural Gas, LNG, Government
- Location
- Prince Rupert, British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Beritaja.com
ConstructChat
Ask ConstructChat about Ksi Lisims LNG Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | approved |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The $20 billion Ksi Lisims LNG project will be located about 100 km north of Prince Rupert and will be powered through the BC Hydro grid. It is a joint venture between the Nisga'a First Nation, Texas-based Western LNG, and Rockies LNG Limited. The project is expected to create 800 jobs during construction and more than 200 ongoing jobs at the site, contributing $17 billion in revenue to the Canadian economy over the life of the project. |
Original sector | Energy |
Budget |
Location
Country | Canada |
State | British Columbia |
City | Prince Rupert |
Source
Source | Beritaja.com |
URL |
More Details
Record type | Project |
Sector | Hydro, Natural Gas, LNG, Government |
Article published date | 2025-09-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Canada
- Suncor Millennium Naptha Unit and Hydrogen Plant
- Residue Storage Areas and Dams
- Ligne à 120 kV du Grand-Brûlé–Dérivation Saint-Sauveur
- Modernisation du réseau de l’Estrie
- Projets et travaux de construction
- Poste d’Argenteuil à 315‑120‑25 kV et lignes d’alimentation
- Projet de déclassement de la centrale de Gentilly-2
- La Vérendrye-Parent
