logo
ProjectClosed

KT Songpa Branch Development Project

The status, timeline and source of this project. A free account opens every field.

Source: Hyundai Engineering

This project involves demolishing the existing KT telecommunications center and building large-scale complex facility as the first luxury modern French five-star hotel and business facility in Korea, with a total floor area of 132,496.48㎡, 5 basement floors to 32 floors above ground, and 28 floors above ground, respectively. The project, which began in 2016 with the goal of efficiently using the S

Status
Closed
Sector
Commercial, Hotel, Telecommunications, Water Supply and Storage, Manufacturing (Industrial)
Location
South Korea
Updated
22 Jul 2026
Source
Hyundai Engineering

ConstructChat

Ask ConstructChat about KT Songpa Branch Development Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “KT Songpa Branch Development Project” is an infrastructure initiative in the Commercial sector, located in South Korea. Taiyo aggregates data on it from Hyundai Engineering.

Participants

Company

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project involves demolishing the existing KT telecommunications center and building large-scale complex facility as the first luxury modern French five-star hotel and business facility in Korea, with a total floor area of 132,496.48㎡, 5 basement floors to 32 floors above ground, and 28 floors above ground, respectively. The project, which began in 2016 with the goal of efficiently using the Songpa branch site, was successfully completed in 2021 starting with demolition at the end of 2018. The two different buildings standing tall toward Seokchon Lake will become new landmarks in Jamsil.Since the site is located in the center of a tourist destination, a top-down method to ensure the  safety and minimize complaints of numerous tourists was adopted. In order to solve the problem of the Seokchon Lake water level lowering in the early stages of construction, the Slurry Wall Method was applied to minimize the outflow of groundwater and maximize the structural safety and water barrier effect. In addition, real-time measurement and monitoring were conducted to solve noise and vibration complaints at Lotte Aquarium adjacent to the site, and the excavation work was completed without any major problems by applying the (low noise low vibration) Tornado Method. The exterior finish construction was successfully completed without any safety accidents resulting from heavy weight and installation of the 32-story high-rise exterior construction, and integrated quality was assured through continuous improvement of construction methods by field employees using curtain walls and stone units.

Original sector

Building

Location

Country

South Korea

Source

Source reliability

High

Source

Hyundai Engineering

URL

More Details

Record type

Project

Sector

Commercial, Hotel, Telecommunications, Water Supply and Storage, Manufacturing (Industrial)

Article published date

2023-05-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project