KTDA Small Hydro

Sector: Raw Materials • Location: Kenya

Source: International Finance Corporation (IFC)

Project
Active

KTDA Power Company Lmited (“KTDA Power”, or the “Company”), is a wholly-owned subsidiary of Kenya Tea Development Agency Holding Limited (“KTDA), set up to develop renewable energy projects to support KTDA’s operations. IFC’s investment (the “Project”) will support the design, construction, operation and maintenance of seven run-of-the-river small-hydropower plants (“SHPs") and related transmissio

Project Information FAQ

Project Information

4 Q
The project “KTDA Small Hydro” is an infrastructure initiative in the Raw Materials sector, located in Kenya. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

KTDA Power Company Lmited (“KTDA Power”, or the “Company”), is a wholly-owned subsidiary of Kenya Tea Development Agency Holding Limited (“KTDA), set up to develop renewable energy projects to support KTDA’s operations. IFC’s investment (the “Project”) will support the design, construction, operation and maintenance of seven run-of-the-river small-hydropower plants (“SHPs") and related transmission lines, ranging from 1.1MW to 6.5MW and with a total installed capacity of 16MW in various locations in Kenya. The SHPs will provide captive power generation for KTDA’s tea factories, and will sell any excess to the state-owned utility company, Kenya Power Company Limited. The total project cost is estimated at $85.6M; IFC’s investment is an A Loan of up to $12.5M and Global Agriculture Food Security Program (GAFSP) Loan of up to $12.5M. KTDA is one of the largest private tea management agencies in East Africa. KTDA is owned by 54 individual tea companies that operate 65 tea processing factories across Kenya. Each tea company is owned by a number of smallholder tea farmers; there are approximately 562,000 smallholders supplying tea leaves to the KTDA companies. KTDA Power was established in 2010 as part of KTDA’s strategy to reduce energy costs at the factories. KTDA Power is developing a portfolio of small, run-of-the-river SHPs with an aggregate generation capacity of up to 29MW across 10 sites in various locations in Kenya. Three out of these 10 sites are fully funded; the remaining seven sites will be covered by IFC’s financing. Each SHP will be owned by newly created asset holding companies, Regional Power Companies (RPCs). In turn, each RPC is jointly owned by several KTDA Tea Factories located in the region where the relevant SHP is constructed. The RPCs are: Kirinyaga Power Company Ltd, Greater Meru Power Company Ltd, Settet Power Company Ltd, and Nyakwana Power Company Ltd. The four RPCs will manage the SHPs within the catchment areas of the tea factories. The design of all seven SHPs is a standard type of run-of-river small hydropower plant with intake, headrace water channel, forebay, penstock and surface power house connected to the tea factory and the national grid. The SHPs are in various stages of development/construction.The engineering, procurement and construction (EPC) contractor for South Mara and Lower Nyamindi is Jiangxi Water and Hydropower Company (JWHC), China and the contractor for Iraru is a JV between Hydropower International Sri Lanka and TransAfrica Energy, Kenya. The contractors will provide O&M services for the first year of operations and subsequently, KTDA Power, through the RPCs, will be responsible to the operations of the SHPs.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data