KULEKHANI-POWER I
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The project consists of: (1) a rock-fill dam of 107 m in height; (2) an intake structure; (3) a headrace tunnel; (4) a surgetank; (5) a penstock; (6) an underground powerhouse containing two 30 MW turbo-generating units; (7) a tailrace tunnel; (8) associated transmission and substation facilities.
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Tunnel, Government, Hydro
- Location
- Nepal
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about KULEKHANI-POWER I
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of: (1) a rock-fill dam of 107 m in height; (2) an intake structure; (3) a headrace tunnel; (4) a surgetank; (5) a penstock; (6) an underground powerhouse containing two 30 MW turbo-generating units; (7) a tailrace tunnel; (8) associated transmission and substation facilities. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Nepal |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Tunnel, Government, Hydro |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
