Kulevi Oil Refinery Construction
The owner, status and timeline of this project. A free account opens every field.
Source: აი, ფაქტი
Construction of the Kulevi oil refinery began in 2023 with an estimated value of $700 million. The project was scheduled to open in March 2025, with the capacity to refine 1.1 million tons of crude oil annually and store 89,000 cubic meters. The refinery includes storage tanks designed for fuel oil, goudron, oils, and bitumen, and aims to increase oil exports to Europe.
- Status
- Under Construction
- Sector
- Oil and Gas, Residential, Commercial
- Location
- Rustavi, Georgia
- Updated
- 22 Jul 2026
- Source
- აი, ფაქტი
ConstructChat
Ask ConstructChat about Kulevi Oil Refinery Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of the Kulevi oil refinery began in 2023 with an estimated value of $700 million. The project was scheduled to open in March 2025, with the capacity to refine 1.1 million tons of crude oil annually and store 89,000 cubic meters. The refinery includes storage tanks designed for fuel oil, goudron, oils, and bitumen, and aims to increase oil exports to Europe. |
Original sector | Energy |
Budget |
Location
Country | Georgia |
City | Rustavi |
Source
Source | აი, ფაქტი |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, Residential, Commercial |
Article published date | 2025-12-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
