logo

Kulim 30-MWac Solar Power Plant

Financial close · Kedah · Last reported May 2026

Source: Market Screener

Project
Financial Close

A 30-MWac (around 50MWp) solar power plant project in Kulim, Kedah, Malaysia, awarded under the Corporate Green Power Programme. The project is a consortium between TotalEnergies (49%) and Solar Citra Sdn. Bhd., a subsidiary of MK Land Holdings Berhad (51%). The facility is expected to generate around 1.5TWh of electricity over its lifetime, with output sold under 21-year power purchase agreements

Status
Closed
Sector
Power Generation (CCGT), Solar, Manufacturing (Industrial)
Location
Kulim, Kedah, Malaysia
Updated
22 Jul 2026
Source
Market Screener

ConstructChat

Ask ConstructChat about Kulim 30-MWac Solar Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Kulim 30-MWac Solar Power Plant” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Kulim, Kedah, Malaysia. Taiyo aggregates data on it from Market Screener.

Participants

Not available for this record.

Status

Original status

financial close

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A 30-MWac (around 50MWp) solar power plant project in Kulim, Kedah, Malaysia, awarded under the Corporate Green Power Programme. The project is a consortium between TotalEnergies (49%) and Solar Citra Sdn. Bhd., a subsidiary of MK Land Holdings Berhad (51%). The facility is expected to generate around 1.5TWh of electricity over its lifetime, with output sold under 21-year power purchase agreements to major industrial and technology customers in Malaysia. Construction will begin once a notice to proceed is issued.

Original sector

Energy

Location

Country

Malaysia

State

Kedah

City

Kulim

Source

Source

Market Screener

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Solar, Manufacturing (Industrial)

Article published date

2026-05-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project