logo

Kulning Wind Energy Project

Sector: Commercial • Location: NV, United States of America

Source: US Department of Transportation (USDOT)

Project
In Progress

Other Agencies with Actions or Authorizations: Department of the Interior, Fish and Wildlife Service Department of the Army, US Army Corps of Engineers - Regulatory Description: UPDATES:  On November 30, 2022, President Biden pledged at the White House Tribal Nations Summit to designate a Avi Kwa Ame National Monument.  The Kulning Wind Energy Project is wholly within the national monument boundar

Project Information FAQ

Project Information

5 Q
The project “Kulning Wind Energy Project” is an infrastructure initiative in the Commercial sector, located in NV, United States of America. Taiyo aggregates data on it from US Department of Transportation (USDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

in progress

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Other Agencies with Actions or Authorizations: Department of the Interior, Fish and Wildlife Service Department of the Army, US Army Corps of Engineers - Regulatory Description: UPDATES:  On November 30, 2022, President Biden pledged at the White House Tribal Nations Summit to designate a Avi Kwa Ame National Monument.  The Kulning Wind Energy Project is wholly within the national monument boundary being proposed by tribes and advocates.  Designation of a Avi Kwa Ame National Monument has the potential to affect the Kulning Wind Energy Project. On October 14, 2022, Crescent Peak Renewables submitted an updated plan of development.  The updated plan of development reduced the project area to 4,970 acres and pro, while the number of wind turbines proposed (68) and the total turbine heights (599' - 759') would remain the same as originally proposed.   The updated plan of development also presented an alternative generation tie (transmission) line configuration (double circuit 69kV) and alignment.  The 12-mile alternative alignment would traverse east adjacent to Walking Box Ranch to interconnect to the Searchlight Substation. _________________________________________________ The Kulning Wind Energy Project (KWEP or Project) proposed by Crescent Peak Renewables (CPR or Applicant) is located on federal lands administered by the U.S. Bureau of Land Management (BLM) in Clark County, Nevada. KWEP is a proposed 308-MW wind energy generation plant consisting of up to 68 wind turbine generators (WTGs), a project substation including switchgear and battery energy storage (BESS) equipment, accompanying ancillary infrastructure, and a 29-mile transmission line to Sloan Canyon Switching Station. The combined area under application is 9,264 acres, but the project will only require temporary and permanent disturbance totaling up to 700 acres or 7.6 percent of the application area. The plant will generate electricity using state of the art WTGs that use algorithms to enhance grid reliability, in addition to augmenting grid stability by offsetting the daytime profile of solar generation with wind generation at night and BESS. The energy from the WTGs would be gathered by an internal electrical collection system at a voltage of 34.5 kV that would be stepped up to 230 kV at a one of the two onsite project substations. The energy would then be transmitted to the grid via a new 230 kV transmission line. CPR intends to construct, operate, and decommission two major types of facilities described in detail below: 1) wind turbines with associated work/crane pads facilities and 2) linear facilities. 1) The wind turbine facilities would be located within an approximately 9,154-acre project area. These facilities would include: The wind turbines and their supporting foundations; The crane and work pads surrounding each wind turbine; Substations and related switchgear, power conditioning and centrally housed BESS facilities; and An on-site O&M facility. 2) Project linear facilities would include: Main and secondary access roads; A 29-mile 230kV gen-tie line to carry electricity to the proposed point of interconnection (up to 110 acres of total disturbance); Collection power lines for wind turbines, buildings and backup for control systems; and Communications cables or lines. NOTE: All Actions and Milestones scheduled after the "Agency Application Evaluation Determination" are subject to a favorable determination by the Agency to continue processing the application.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data