Kulob Distribution Grid Reinforcement
The status, timeline and source of this project. A free account opens every field.
Source: European Bank for Reconstruction and Development (EBRD)
The Bank intends to provide asovereign loan of up to €10 million on-lent to OJSC ShabakahoiTaqsimotiBarq (the "Company")to finance the reinforcement of the electricity distribution lines and installation of advanced metering infrastructure in the city of Kulob and its surrounding areas (the "Project").
- Status
- Prospective
- Sector
- Energy Storage, Power Transmission, Commercial, Residential, Power Generation (CCGT)
- Location
- Tajikistan
- Updated
- 19 Nov 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Kulob Distribution Grid Reinforcement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | approved |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Bank intends to provide asovereign loan of up to €10 million on-lent to OJSC ShabakahoiTaqsimotiBarq (the "Company")to finance the reinforcement of the electricity distribution lines and installation of advanced metering infrastructure in the city of Kulob and its surrounding areas (the "Project"). |
Original sector | Energy |
Budget |
Location
Country | Tajikistan |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Transmission, Commercial, Residential, Power Generation (CCGT) |
Article published date | 2026-08-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in Tajikistan
- Tajikistan: Regional Power Transmission Project
- Regional Power Transmission Interconnection Project (AFG/TAJ)
- Energy Loss Reduction Tajikistan
- Distribution Network Digitalisation
- Additional Financing to Rural Electrification Project
- Energy Loss Reduction - Phase II
- Bokhtar E-Buses
- Photovoltaic Energy Storage Power Station
