In September 2020, the Bank approved a sovereign loan of up to EUR 7.5 million to the Republic of Tajikistan, on-lent to the state enterprise Kulob Water and Wastewater Services (the "Company"), wholly owned by the national utility services holding, the State Unitary Enterprise Khojagii Manziliyu Kommunali (KMK). The loan was co-financed by an investment grant of EUR 7.5 million from the European
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Government, Residential, Commercial, Education, Power Transmission, Power Generation (CCGT)
- Location
- Tajikistan
- Updated
- 19 Nov 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Kulob Water and Wastewater Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | approved |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | In September 2020, the Bank approved a sovereign loan of up to EUR 7.5 million to the Republic of Tajikistan, on-lent to the state enterprise Kulob Water and Wastewater Services (the "Company"), wholly owned by the national utility services holding, the State Unitary Enterprise Khojagii Manziliyu Kommunali (KMK). The loan was co-financed by an investment grant of EUR 7.5 million from the European Union (EU). The financing was provided for the rehabilitation of water and wastewater infrastructure in the city of Kulob including (i) water network, (ii) wastewater treatment plant, (iii) procurement of new machines and equipment, and (iv) hydraulic modelling. Changes to the project's technical design combined with inflationary pressures resulted in a funding gap of up to EUR 1.5 million. The funding of this gap was approved by the Bank as an additional sovereign loan in February 2025, resulting in the total financing of EUR 16.5 million. The original project remains on track for physical completion by March 2027. However, implementation has highlighted the need for additional investments to fully achieve the project's objectives, including expanding access to safe water services and reducing water losses. A feasibility study identified a further investment programme of up to EUR 9.0 million. To address this funding gap, the Bank proposes an additional sovereign loan of up to EUR 6.2 million, co-financed by an investment grant of up to EUR 2.8 million from the EBRD Shareholders Special Fund (SSF). The proposed financing would increase the total investment package to up to EUR 25.5 million. |
Original sector | Municipal Infrastructure |
Budget |
Location
Country | Tajikistan |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Government, Residential, Commercial, Education, Power Transmission, Power Generation (CCGT) |
Article published date | 2026-09-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Tajikistan
- Sangtuda 2 Hydropower Plant
- PamirEnergy
- Tajikistan: Obigarm-Nurobod Road Project - Long Bridge and Approaches
- Enhancing Sustainability: Financing for the Rogun Hydropower Project
- Yavan Water
- Tajikistan: Nurek Hydropower Rehabilitation, Phase I
- Water Resources Management in Pyanj River Basin Project
- Central Asia Regional Economic Cooperation Corridors 2, 5, and 6 (Dushanbe–Kurgonteppa) Road Project