logo

Kumar Bhaskar Varma Setu

Sector: Bridge • Location: Guwahati, Assam, India

Source: DD News

Project
Completed

A 2.86-km-long, six-lane extradosed Prestressed Concrete (PSC) bridge over the Brahmaputra River in Guwahati, designed to enhance connectivity and reduce travel time between Guwahati and North Guwahati. It incorporates base isolation technology and a Bridge Health Monitoring System for durability and safety.

Project Information FAQ

Project Information

4 Q
The project “Kumar Bhaskar Varma Setu” is an infrastructure initiative in the Bridge sector, located in Guwahati, Assam, India. Taiyo aggregates data on it from DD News.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

A 2.86-km-long, six-lane extradosed Prestressed Concrete (PSC) bridge over the Brahmaputra River in Guwahati, designed to enhance connectivity and reduce travel time between Guwahati and North Guwahati. It incorporates base isolation technology and a Bridge Health Monitoring System for durability and safety.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data