Kumarapalayam Tollways Limited
Sector: Bridge • Location: India
Source: World Bank Group
In January 2006, National Highways Authority of India (NHAI) signed a 20 year concession contract with Kumarapalayam Tollways Limited (KTL) for the upgrade, operation and maintenance of the 48.5 km stretch on National Highway 47 (NH-47), between Kumarapalayam and Chengapalli, in the southern state of Tamil Nadu. Under the agreement, KTL was required to design, finance and widen the existing two-la
- Status
- Prospective
- Sector
- Bridge, Road, Tunnel, Commercial, Government
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Kumarapalayam Tollways Limited
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In January 2006, National Highways Authority of India (NHAI) signed a 20 year concession contract with Kumarapalayam Tollways Limited (KTL) for the upgrade, operation and maintenance of the 48.5 km stretch on National Highway 47 (NH-47), between Kumarapalayam and Chengapalli, in the southern state of Tamil Nadu. Under the agreement, KTL was required to design, finance and widen the existing two-lane stretch to a four lane highway with paved shoulders in return for the right to collect tolls during the concession term. KTL was also responsible for the construction of nearly 39 km of service roads on both sides of the highway, six bypasses, seven bridges, three flyovers, seven underpasses, 19 bus stops and other wayside amenities. The concession term included the construction period of 30 months. This road upgrade project was expected to ease traffic congestion and give significant stimulus to trade and commerce in the entire region. KTL, a wholly owned subsidiary of India’s IVRCL Infrastructures & Projects Ltd. (IVRCL), was established exclusively to implement this project. IVRCL won the concession in an international competitive tender conducted by NHAI by making the lowest subsidy request in the amount of US$ 3.9 million. The total capital cost of the project was estimated at US$ 93 million. The project reached financial closure in September 2006. The project was financed through a combination of equity (US$ 14.4 million), debt (US$ 74.8 million) and a grant from NHAI (US$ 3.9 million). The debt was arranged by Infrastructure Development Finance Company Limited (IDFC). Construction work on the project began in September 2006 and was expected to be completed by March 2009. None None |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | India |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Bridge, Road, Tunnel, Commercial, Government |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in India
- Kharar - Ludhiana section of NH - 95 (new NH - 05)
- NK Toll Road Limited
- Mumbai Nasik Expressway Limited
- Nardhana ROB (Railway over Bridge)
- Transstroy Bhopal Berasia Sironj Tollways Private Limited
- MBL (MP) Toll Road Company Limited
- Indore-Edelabad Road
- Soma Isolux Varanasi Aurangabad Tollway Private Limited
