Kumaraswamy project out side Infrastrecture
The status, timeline and source of this project. A free account opens every field.
Source: India Investment Grid (IIG)
Information National Mineral Development Corporation Limited [NMDC] has come up with Kumaraswamy project out side Infrastrecture with a ticket size of 27.99 INR Crores. This project in Mine sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project Kumaraswamy Iron Ore Mine i.e KIOM of NMDC Ltd. M
- Status
- Closed
- Sector
- Manufacturing (Industrial), Power Transmission, Road, Power Generation (CCGT), Government, Metal, Steel, Automotive
- Location
- Ballari, Karnataka, India
- Updated
- 22 Jul 2026
- Source
- India Investment Grid (IIG)
ConstructChat
Ask ConstructChat about Kumaraswamy project out side Infrastrecture
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | notice to proceed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Information National Mineral Development Corporation Limited [NMDC] has come up with Kumaraswamy project out side Infrastrecture with a ticket size of 27.99 INR Crores. This project in Mine sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project Kumaraswamy Iron Ore Mine i.e KIOM of NMDC Ltd. ML No: 1111 has obtained stage-II Forest Clearance for 341.20Ha forest land from MOEF&CC vide letter dated 24.7.2006. NMDC has constructed a down-hill conveyor for the transportation of ore, approach roads for the movement of vehicles and a Power line for transmission of power and are in use exclusively for KIOM and have been in operation since 2011 i.e 16.5Ha. As per condition no: 3 of FC letter, the lease period of diverted forest land shall be co-terminus with the current mining lease granted under MMDR Act, 1957. Earlier lease was valid upto 17.10.2022. NMDC has obtained an extension of lease period for further period of 20 years from the Government of Karnataka, Commerce, and Industries Dept till 17.10.2042 as per MMDR Amendment Act 2015 , 324.70Ha excluding 16.5ha infrastructure area due to the area is outside of Mining Lease. |
Original sector | Metals & Mining |
Procurement method | |
Budget |
Location
Country | India |
State | Karnataka |
City | Ballari |
Source
Source | India Investment Grid (IIG) |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Transmission, Road, Power Generation (CCGT), Government, Metal, Steel, Automotive |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in India
- Kiru Hydroelectric Project Jammu and Kashmir India
- Pinnapuram Integrated Renewable Energy Project India
- Chuzachen Hydroelectric Power Project Sikkim
- Mahan I Power Project Madhya Pradesh
- Rampur Hydro Electric Power Project Himachal Pradesh
- UriII Hydroelectric Project Jammu and Kashmir
- Kakrapar Atomic Power Station Expansion
- Nathpa Jhakri India Hydroelectric Power Plant
