Kumaraswamy project out side Infrastrecture
Sector: Metal • Location: Ballari, Karnataka, India
Source: India Investment Grid (IIG)
Information National Mineral Development Corporation Limited [NMDC] has come up with Kumaraswamy project out side Infrastrecture with a ticket size of 27.99 INR Crores. This project in Mine sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project Kumaraswamy Iron Ore Mine i.e KIOM of NMDC Ltd. M
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | notice to proceed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Information National Mineral Development Corporation Limited [NMDC] has come up with Kumaraswamy project out side Infrastrecture with a ticket size of 27.99 INR Crores. This project in Mine sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project Kumaraswamy Iron Ore Mine i.e KIOM of NMDC Ltd. ML No: 1111 has obtained stage-II Forest Clearance for 341.20Ha forest land from MOEF&CC vide letter dated 24.7.2006. NMDC has constructed a down-hill conveyor for the transportation of ore, approach roads for the movement of vehicles and a Power line for transmission of power and are in use exclusively for KIOM and have been in operation since 2011 i.e 16.5Ha. As per condition no: 3 of FC letter, the lease period of diverted forest land shall be co-terminus with the current mining lease granted under MMDR Act, 1957. Earlier lease was valid upto 17.10.2022. NMDC has obtained an extension of lease period for further period of 20 years from the Government of Karnataka, Commerce, and Industries Dept till 17.10.2042 as per MMDR Amendment Act 2015 , 324.70Ha excluding 16.5ha infrastructure area due to the area is outside of Mining Lease. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Metal projects in India
- Koldam Hydroelectric Power Plant
- West Pharmaceutical Services Pharmaceutical Packaging Plant, Sri City, Andhra Pradesh
- Ford Factory, Gujarat
- Blast Furnace at SAIL - Bhilai Steel Plant
- Water Storage Reservoir for the Visakhapatnam Steel Plant
- Singoli-Bhatwari Hydro Electric Power Project
- Bandra Cable Stay Bridge – Bandra Worli Sea Link Project, Mumbai, India
- Abhijeet Toll Road Karnataka Limited
