logo

Kumaraswamy project out side Infrastrecture

Sector: Metal • Location: Ballari, Karnataka, India

Source: India Investment Grid (IIG)

Project
Notice To Proceed

Information National Mineral Development Corporation Limited [NMDC] has come up with Kumaraswamy project out side Infrastrecture with a ticket size of 27.99 INR Crores. This project in Mine sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project Kumaraswamy Iron Ore Mine i.e KIOM of NMDC Ltd. M

Project Information FAQ

Project Information

5 Q
The project “Kumaraswamy project out side Infrastrecture” is an infrastructure initiative in the Metal sector, located in Ballari, Karnataka, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

notice to proceed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information National Mineral Development Corporation Limited [NMDC] has come up with Kumaraswamy project out side Infrastrecture with a ticket size of 27.99 INR Crores. This project in Mine sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project Kumaraswamy Iron Ore Mine i.e KIOM of NMDC Ltd. ML No: 1111 has obtained stage-II Forest Clearance for 341.20Ha forest land from MOEF&CC vide letter dated 24.7.2006. NMDC has constructed a down-hill conveyor for the transportation of ore, approach roads for the movement of vehicles and a Power line for transmission of power and are in use exclusively for KIOM and have been in operation since 2011 i.e 16.5Ha. As per condition no: 3 of FC letter, the lease period of diverted forest land shall be co-terminus with the current mining lease granted under MMDR Act, 1957. Earlier lease was valid upto 17.10.2022. NMDC has obtained an extension of lease period for further period of 20 years from the Government of Karnataka, Commerce, and Industries Dept till 17.10.2042 as per MMDR Amendment Act 2015 , 324.70Ha excluding 16.5ha infrastructure area due to the area is outside of Mining Lease.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data