Kuraymat Solar/CCNG Plant

Sector: Wind • Location: Giza, Egypt, Arab Rep.

Source: World Bank Group

Project
Active

Solar Millennium from Germany, through its subsidiary Flagsol, developed the 150MW Kuraymat power plant, utilizing a combination of CSP and CCNG technology. Flagsol partnered with Orascom Construction (Egypt) during construction and will operate the plant for two years after commissioning. The project includes 2,000 collector units with over 53,000 parabolic mirrors. The project is located in Kur

Project Information FAQ

Project Information

5 Q
The project “Kuraymat Solar/CCNG Plant” is an infrastructure initiative in the Wind sector, located in Giza, Egypt, Arab Rep.. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Solar Millennium from Germany, through its subsidiary Flagsol, developed the 150MW Kuraymat power plant, utilizing a combination of CSP and CCNG technology. Flagsol partnered with Orascom Construction (Egypt) during construction and will operate the plant for two years after commissioning. The project includes 2,000 collector units with over 53,000 parabolic mirrors. The project is located in Kuraymat, 100 kilometers south of Cairo. The project consisted of 74.4MW gas turbine, 59.5MW steam turbine (total 133.9MW) and a CSP element of 19.2MW. Total output of the solar element was expected at 852,000 MWh/yr. The O&M contract is held by Orascom Construction in cooperation with Flagsol, who had 6 engineers on site. Flagsol won the contract after an international tender held by the Egyptian Energy Authority, NREA. The CCNG element was developed b Iberdrola, from Spain. Construction started in January 2009, commissioning in 2012. Final ownership was to be New and Renewable Energy Authority (NREA). FC was estimated at January 2010 (25%). Total project cost was EUR250 million ($314.7 million), of which 30% was reportedly attributable to the CSP element (EUR75 million, $94.4 million). Part of the financing was provided by the GEF, administred by the IBRD - $49 million. The remaining foreign currency debtwas financed by JBIC (Japan Bank for International Cooperation). Coordinates are: 29° 16’ 45,81’’ North and 31° 15’ 9,43’’ East. http://www.pv-tech.org/news/solar_millenniums_150mw_kuraymat_solar_hybrid_plant_touts_performance_8_ove http://www.flagsol.com/flagsol/english/company/news/2011_09_22-kuraymat.html http://www.fichtnersolar.com/material/fichtnersolar_SolarPACES2009_Kuraymat_Brakmann.pdf http://www.nrel.gov/csp/solarpaces/project_detail.cfm/projectID=65

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data