KUREIMAT POWER PROJE
Sector: Power Generation (CCGT) • Location: Egypt, Arab Republic of
Source: World Bank Group
The Kureimat Power Project will assist the Egyptian Electricity Authority (EEA) in: (a) alleviating power shortages; (b) improving the growing demand for electricity; (c) improving the efficiency and reliability of the EEA interconnected system; (d) strengthening the EEA finanical position; and (e) improving the technical and managerial skills of EEA staff. The project consists of: (a) the supp
- Status
- Closed
- Sector
- Power Generation (CCGT), Manufacturing (Industrial), Natural Gas, Geothermal, Government
- Location
- Egypt
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about KUREIMAT POWER PROJE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Kureimat Power Project will assist the Egyptian Electricity Authority (EEA) in: (a) alleviating power shortages; (b) improving the growing demand for electricity; (c) improving the efficiency and reliability of the EEA interconnected system; (d) strengthening the EEA finanical position; and (e) improving the technical and managerial skills of EEA staff. The project consists of: (a) the supply and installation of a dual fuel-fired thermal power station at Kureimat with a net installed capacity of 1,200 MW; (b) the supply of material and equipment for about 162 km of a 20-inch diameter natural gas pipeline interconnecting the power station with the gas grid; (c) the supply and installation of about 150 km of 500-kV and about 90 km of 220-kV transmission lines, and line loss reduction equipment; (d) the rehabilitation of Tanta substation; and (e) technical assistance to help EEA with engineering supervision at the power station, providing training to EEA staff, completion of energy data bank and management information system, computerization of EEA finanical management system and introduction of efficient load management system by procurement of special meters for industrial and bulk consumers. |
Original sector | Energy and Extractives |
Budget |
Location
Country | Egypt |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Manufacturing (Industrial), Natural Gas, Geothermal, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
