logo

Kurgan-Tyube Solid Waste

Sector: Government • Location: Tajikistan

Source: European Bank for Reconstruction and Development (EBRD)

Project
Repaying

Translated version of this PSD: Russian The EBRD is considering providing financing for a programme of priority capital investments to improve the solid waste management services in Kurgan-Tyube city. Proceeds from this transaction will support an investment programme aimed to (i) improve landfill sanitary/operating standards and (ii) increase efficiency/coverage of solid waste operations in Kurga

Project Information FAQ

Project Information

4 Q
The project “Kurgan-Tyube Solid Waste” is an infrastructure initiative in the Government sector, located in Tajikistan. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

repaying

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Translated version of this PSD: Russian The EBRD is considering providing financing for a programme of priority capital investments to improve the solid waste management services in Kurgan-Tyube city. Proceeds from this transaction will support an investment programme aimed to (i) improve landfill sanitary/operating standards and (ii) increase efficiency/coverage of solid waste operations in Kurgan-Tyube. The transition impact of this project is expected to include: State Unitary Communal Enterprise “Khojagii Manziliy Kommunali” (“KMK”) of Kurgan-Tyube City. The EBRD will provide a sovereign guaranteed loan of up to US$ 2 million to SUE KMK of Kurgan-Tyube. Up to US$ 5.3 million including investment and technical cooperation grants. The project will be co-financed by an investment grant from an international donor. The project has been categorised B. Potential adverse future environmental and social impacts associated with rehabilitation of waste collection, transportation, recycling and disposal services in Kurgan Tyube and the surrounding area, closure of the existing dumpsites and rehabilitation and extension of the existing landfill are likely to be site-specific. These can be readily identified and addressed through adequate mitigation measures. The project will bring substantial environmental, health and safety benefits to the city of Kurgan-Tyube and the surrounding communities through the rehabilitation of waste collection, transportation, and disposal services; increased operational efficiency, and environmental and hygiene standards. However, due to the budgetary and financial constraints, the waste management system to be introduced will not fully comply with the relevant EU environmental standards related to waste recovery, recycling and re-use). Therefore, the project was approved with derogation from the Environmental and Social Policy by EBRD Board of Directors. The Environmental and Social Due Diligence (ESDD) included an independent environmental and social audit of the Company's current operations and facilities, and an analysis of potential environmental and social issues associated with the proposed PIP. The Company's environmental and social management capabilities were also reviewed and assessed, as well as tariff affordability issues, resettlement, livelihood and gender-related impacts. Currently, solid waste is transported to a dumpsite located 25 km from the city. The Company has also been using a dump site located within the city, which sits on top of an abandoned clay pit. The Project covers rehabilitation and extension of only the dumpsite outside the City. The closure of the dumpsite within the City will be the City's responsibility taken under the Project Support Agreement and ESAP. As part of the closure, all the waste from the city dump will be transported to the dumpsite outside the City over a period of 3 years. The results of the ESDD confirm that the existing waste management practices and facilities are very poor and not in compliance with the EBRD Performance Requirements and, specifically, the current EU standards. The dumpsites are being operated with insufficient technical equipment and the operation does not comply with basic environmental and health standards. Also, due to the lack of personal protective equipment, health and safety standards for the workers performing waste collection and landfill operations are low. However, the investigations indicate that if adequate technical and operational measures are implemented, the area of the existing dumpsite outside the City can be used for future extension without significant risks to human health and environment pollution. The initial due diligence estimated that 11 families live on, or adjacent to, the dumpsite within the city. In actual fact only two recently constructed structures are in the middle of and on the waste, with the other houses being of a more substantial nature and not having been built on the waste. A resettlement framework has been prepared with a resettlement action plan being currently prepared. This will be a two stage process; initially there will be resettlement of the two houses as soon as the Project support consultants are in place, and then resettlement of the other houses later, depending upon their structure and foundations. The City wants to re-establish this as a green space/residential area. There are approximately 20 people who are currently engaged in the collection of secondary material on the site outside of the City. It has been agreed with the waste company that they will be provided with work and this is reflected in the ESAP. The site within the City is to be cleared within 3 years of loan effectiveness. Tariffs are to be increased as part of the cost recovery programme but these will remain below the 2.5 per cent of average disposal incomes for most of the projected period. For the years when the tariffs are above this threshold, the City is expected to administer targeted subsidies to the lowest income families. These activities will be supported by the corporate development consultants. An Environmental and Social Action Plan (ESAP) has been developed for mitigation of identified E&S issues and impacts during preparation, construction and operation of the project including the following main areas: development and implementation of EHS management systems; remediation of the City Dump in compliance with the mitigation measures defined under the ESAP; establishment of good EHS management practises for waste collection and disposal activities (optimised landfill gas and leachate collection, noise minimisation, avoidance of littering, birds, vermin, use of PPEs, site security and access control, etc.); monitoring requirements; customer relations; HR issues (salary scales, recruitment, organisation structure, internal grievance mechanisms, etc.); implementation of the RAP; chance find procedures. The Company will provide the Bank with annual environmental and social reports, including updates on the implementation of the ESAP and resettlement action plan. The Bank will conduct monitoring visits, as required, and commission a completion audit. The following technical co-operation (“TC”) assignments are a part of this project: Pre-signing TC 1. Feasibility Study US$ 370,000 (€290,000) feasibility study financed by EU Investment Facility for Central Asia (IFCA) will, among other things, (a) prepare a plan and cost estimates for improving waste collection and the disposal capacity of the landfill, (b) assess the options for landfill facility upgrade, (c) review operations and recommend improvements and (d) prepare a strategic and operational business plan to enable Kurgan-Tyube KMK to extend the collection services; Post-signing TC 1. Project Implementation Support International consultants will assist the Project Implementation Unit with engineering design, procurement, contract administration, engineer’s supervision, financial control, project management and reporting. US$ 500,000 (€390,000), proposed to be financed by an international donor or the ETC Fund. 2. Corporate Development, Stakeholder Participation and City Support Programme Consultants will be hired to support operational and financial improvements to secure sustainability of the Company operations, implement a Stakeholder Participation Programme, and introduce a Public Service Contract between the Company and the City. US$ 440,000 (€342,000), proposed to be financed by an international donor or the ETC Fund.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data