Kurnell Battery Energy Storage System (BESS)
Sector: Power Generation (CCGT) • Location: Kurnell, New South Wales, Australia
Source: St George & Sutherland Shire Leader
Ampol is proposing a Battery Energy Storage System (BESS) with up to 800 MW capacity and 3800 MWh duration, consisting of containerised or stacked lithium-ion batteries up to six metres high. The facility will connect to the Ausgrid substation at Kurnell and store electricity from the network to release during high demand periods. It is part of Ampol's vision for a Kurnell Energy and Industry Hub
- Status
- Prospective
- Sector
- Power Generation (CCGT), Energy Storage, Oil and Gas, Residential, Commercial, Warehouse
- Location
- Kurnell, New South Wales, Australia
- Updated
- 22 Jul 2026
- Source
- St George & Sutherland Shire Leader
ConstructChat
Ask ConstructChat about Kurnell Battery Energy Storage System (BESS)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Ampol is proposing a Battery Energy Storage System (BESS) with up to 800 MW capacity and 3800 MWh duration, consisting of containerised or stacked lithium-ion batteries up to six metres high. The facility will connect to the Ausgrid substation at Kurnell and store electricity from the network to release during high demand periods. It is part of Ampol's vision for a Kurnell Energy and Industry Hub following the refinery closure in 2014. |
Original sector | Energy |
Location
Country | Australia |
State | New South Wales |
City | Kurnell |
Source
Source | St George & Sutherland Shire Leader |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Energy Storage, Oil and Gas, Residential, Commercial, Warehouse |
Article published date | 2025-05-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
