logo
ProjectAwarded

Kurnool-III ISTS Scheme

The owner, status and timeline of this project. A free account opens every field.

Source: T&D India

The Kurnool III scheme involves augmentation of the Kurnool III Pooling Station through four ICTs of 1500 MVA, 765/400kV, and a 765kV double-circuit line of 260 km from Kurnool III PS to Chilakaluripeta substation. It aims to integrate additional renewable energy generation projects.

Status
Closed
Sector
Power Generation (CCGT), Road
Location
Andhra Pradesh, India
Updated
22 Jul 2026
Source
T&D India

ConstructChat

Ask ConstructChat about Kurnool-III ISTS Scheme

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Kurnool-III ISTS Scheme” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Andhra Pradesh, India. Taiyo aggregates data on it from T&D India.

Participants

Not available for this record.

Status

Original status

Awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Kurnool III scheme involves augmentation of the Kurnool III Pooling Station through four ICTs of 1500 MVA, 765/400kV, and a 765kV double-circuit line of 260 km from Kurnool III PS to Chilakaluripeta substation. It aims to integrate additional renewable energy generation projects.

Original sector

Power Transmission

Budget

Location

Country

India

State

Andhra Pradesh

Source

Source

T&D India

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Road

Article published date

2025-03-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project