logo

Kurty-Burybaital Road Project Extension II

Sector: Road • Location: Kazakhstan

Source: European Bank for Reconstruction and Development (EBRD)

Project
Repaying

The provision of finance for the reconstruction of a 67 km long Kurty-Kapshagai road section of the Almaty-Astana highway, Centre-South transport corridor in Kazakhstan. The JSC KazAutoZhol under the Ministry of Investment and Development is the road agency that is seeking the EBRD finance for a section of the 67km long section “Kurty-Kapshagai” (the “Project”). The proposed investments include th

Project Information FAQ

Project Information

4 Q
The project “Kurty-Burybaital Road Project Extension II” is an infrastructure initiative in the Road sector, located in Kazakhstan. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

repaying

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The provision of finance for the reconstruction of a 67 km long Kurty-Kapshagai road section of the Almaty-Astana highway, Centre-South transport corridor in Kazakhstan. The JSC KazAutoZhol under the Ministry of Investment and Development is the road agency that is seeking the EBRD finance for a section of the 67km long section “Kurty-Kapshagai” (the “Project”). The proposed investments include the reconstruction of the existing road (two-lanes, Kazakh technical category 2 road), the reconstruction of bridges and upgrading of intersections as well as financing of supervising engineers, implementation assistance and institutional components. As this Project involves the reconstruction and widening of the existing road (from two lanes to four-lane) for the 67 km of the road section, the EBRD has assigned it a Category A, which means that a comprehensive Environmental and Social  Impact Assessment (ESIA) and review of associated documents must be carried out, followed by their public disclosure for a minimum period of 120 days. There is a project summary document available for this project. Full ESIA documentation is available locally at: Asel Zeinullina, E&S Senior Expert, JSC KazAutoZhol Phone: +7-701-982-66-57 Astana, Amman 8, BC Milano Email: a.zeinullina@kazautozhol.kz And EBRD Resident Office in Astana 2, Dostyk street Saad Business Centre 010000 Astana Kazakhstan Tel. +7 7172 554246 Fax.: +7 7172 554245 E-mail: AstanaRO@ebrd.com And Website: English | Kazakh | Russian Environmental or social enquiries Asel Zeinullina, E&S Senior Expert

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data