logo
ProjectRepaying

Kurty-Burybaital Road Project Extension II

Sector: Road • Location: Kazakhstan

Source: European Bank for Reconstruction and Development (EBRD)

The provision of finance for the reconstruction of a 67 km long Kurty-Kapshagai road section of the Almaty-Astana highway, Centre-South transport corridor in Kazakhstan. The JSC KazAutoZhol under the Ministry of Investment and Development is the road agency that is seeking the EBRD finance for a section of the 67km long section “Kurty-Kapshagai” (the “Project”). The proposed investments include th

Status
Under Construction
Sector
Road, Residential, Commercial, Government
Location
Kazakhstan
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Kurty-Burybaital Road Project Extension II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Kurty-Burybaital Road Project Extension II” is an infrastructure initiative in the Road sector, located in Kazakhstan. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Sponsoring Agency

Status

Original status

repaying

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The provision of finance for the reconstruction of a 67 km long Kurty-Kapshagai road section of the Almaty-Astana highway, Centre-South transport corridor in Kazakhstan. The JSC KazAutoZhol under the Ministry of Investment and Development is the road agency that is seeking the EBRD finance for a section of the 67km long section “Kurty-Kapshagai” (the “Project”). The proposed investments include the reconstruction of the existing road (two-lanes, Kazakh technical category 2 road), the reconstruction of bridges and upgrading of intersections as well as financing of supervising engineers, implementation assistance and institutional components. As this Project involves the reconstruction and widening of the existing road (from two lanes to four-lane) for the 67 km of the road section, the EBRD has assigned it a Category A, which means that a comprehensive Environmental and Social  Impact Assessment (ESIA) and review of associated documents must be carried out, followed by their public disclosure for a minimum period of 120 days. There is a project summary document available for this project. Full ESIA documentation is available locally at: Asel Zeinullina, E&S Senior Expert, JSC KazAutoZhol Phone: +7-701-982-66-57 Astana, Amman 8, BC Milano Email: a.zeinullina@kazautozhol.kz And EBRD Resident Office in Astana 2, Dostyk street Saad Business Centre 010000 Astana Kazakhstan Tel. +7 7172 554246 Fax.: +7 7172 554245 E-mail: AstanaRO@ebrd.com And Website: English | Kazakh | Russian Environmental or social enquiries Asel Zeinullina, E&S Senior Expert

Original sector

Transport

Location

Country

Kazakhstan

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Road, Residential, Commercial, Government

Article published date

2025-07-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project