Kurty-Burybaital Road Project Extension II
Sector: Road • Location: Kazakhstan
Source: European Bank for Reconstruction and Development (EBRD)
The provision of finance for the reconstruction of a 67 km long Kurty-Kapshagai road section of the Almaty-Astana highway, Centre-South transport corridor in Kazakhstan. The JSC KazAutoZhol under the Ministry of Investment and Development is the road agency that is seeking the EBRD finance for a section of the 67km long section “Kurty-Kapshagai” (the “Project”). The proposed investments include th
- Status
- Under Construction
- Sector
- Road, Residential, Commercial, Government
- Location
- Kazakhstan
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Kurty-Burybaital Road Project Extension II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | repaying |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The provision of finance for the reconstruction of a 67 km long Kurty-Kapshagai road section of the Almaty-Astana highway, Centre-South transport corridor in Kazakhstan. The JSC KazAutoZhol under the Ministry of Investment and Development is the road agency that is seeking the EBRD finance for a section of the 67km long section “Kurty-Kapshagai” (the “Project”). The proposed investments include the reconstruction of the existing road (two-lanes, Kazakh technical category 2 road), the reconstruction of bridges and upgrading of intersections as well as financing of supervising engineers, implementation assistance and institutional components. As this Project involves the reconstruction and widening of the existing road (from two lanes to four-lane) for the 67 km of the road section, the EBRD has assigned it a Category A, which means that a comprehensive Environmental and Social Impact Assessment (ESIA) and review of associated documents must be carried out, followed by their public disclosure for a minimum period of 120 days. There is a project summary document available for this project. Full ESIA documentation is available locally at: Asel Zeinullina, E&S Senior Expert, JSC KazAutoZhol Phone: +7-701-982-66-57 Astana, Amman 8, BC Milano Email: a.zeinullina@kazautozhol.kz And EBRD Resident Office in Astana 2, Dostyk street Saad Business Centre 010000 Astana Kazakhstan Tel. +7 7172 554246 Fax.: +7 7172 554245 E-mail: AstanaRO@ebrd.com And Website: English | Kazakh | Russian Environmental or social enquiries Asel Zeinullina, E&S Senior Expert |
Original sector | Transport |
Location
Country | Kazakhstan |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Road, Residential, Commercial, Government |
Article published date | 2025-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
