logo

Kuwait International Airport New Terminal building (KIA-T2) Project

Sector: Aerospace & Defense • Location: Kuwait

Source: InfraPPPWorld

Project
Project In Construction

The project involves the construction and operation of a new terminal (T2) at the international airport in Kuwait.The scope of work includes the development of a new passenger terminal, a third runway, the expansion and renovation of the two existing runways and other facilities. The terminal's trefoil layout consists of three symmetrical wings with departure gates. The facades will span 1.2 km an

Project Information FAQ

Project Information

5 Q
The project “Kuwait International Airport New Terminal building (KIA-T2) Project” is an infrastructure initiative in the Aerospace & Defense sector, located in Kuwait. Taiyo aggregates data on it from InfraPPPWorld.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

project in construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves the construction and operation of a new terminal (T2) at the international airport in Kuwait.The scope of work includes the development of a new passenger terminal, a third runway, the expansion and renovation of the two existing runways and other facilities. The terminal's trefoil layout consists of three symmetrical wings with departure gates. The facades will span 1.2 km and extend from a dramatic 25 m-high central space. There will be one underground level and four above-ground levels in T2. There will be 120 check-in counters and a 2,930 bag-per-hour 13 MAP baggage processing system. There will be high-speed baggage sorters for around 1.5 km and the baggage conveyors will span about 6 km. The integrated luggage system has capabilities for screening, dynamic storing, and sorting.The new terminal is being develope in three phases. The first phase will add a capacity of 13 million passengers a year, the subsequent phases will enhance the capacity to between 25 million and 50 million passengers a year.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data