Kwikwetlem First Nation and Coquitlam - Joint Flood Mitigation Program
One of 10,000+ projects Taiyo tracks in British Columbia.
Source: Infrastructure Canada
The City of Coquitlam and k¿ik¿¿¿¿¿m First Nation would like to complete coordinated and shared flood protection improvements along the confluence of the lower Coquitlam River and the Fraser River, which involves upgrading and integrating an existing dike network. The proposed dike upgrades would be phased as necessary, and would also consider the following: Access and egress into Colony Farm an
- Status
- Prospective
- Sector
- Mass Transit, Hydro, Raw Materials, Rail, Water Supply and Storage, Government
- Location
- British Columbia, Canada
- Updated
- 19 Nov 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Kwikwetlem First Nation and Coquitlam - Joint Flood Mitigation Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | pre-construction |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The City of Coquitlam and k¿ik¿¿¿¿¿m First Nation would like to complete coordinated and shared flood protection improvements along the confluence of the lower Coquitlam River and the Fraser River, which involves upgrading and integrating an existing dike network. The proposed dike upgrades would be phased as necessary, and would also consider the following: Access and egress into Colony Farm and k¿ik¿¿¿¿¿m lands Fish habitat improvements Protection of the k¿ik¿¿¿¿¿m cemetery Protection of the k¿ik¿¿¿¿¿m transformer stone Consideration of a proposed new dock/boom at the Fraser River and Coquitlam River confluence Archaeological investigation Existing and anticipated siltation within the Coquitlam River; and Coordination as appropriate with Port Coquitlam, Metro Vancouver, BC Hydro, and CP Railway (considering that the dikes on the east side of the Coquitlam River would not be upgraded as part of this grant application). The physical works would include the following: Upgraded linear dikes, including armouring adjacent IR#1 where necessary New linear dikes (if necessary), including consideration of access and egress into Colony Farm Regional Park and k¿ik¿¿¿¿¿m lands Fish habitat improvements Upgraded flood box(es) (if necessary) |
Original sector | Climate Resilience |
Budget |
Location
Country | Canada |
State | British Columbia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Hydro, Raw Materials, Rail, Water Supply and Storage, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
