logo
ProjectPre-Construction

Kwikwetlem First Nation and Coquitlam - Joint Flood Mitigation Program

One of 10,000+ projects Taiyo tracks in British Columbia.

Source: Infrastructure Canada

The City of Coquitlam and k¿ik¿¿¿¿¿m First Nation would like to complete coordinated and shared flood protection improvements along the confluence of the lower Coquitlam River and the Fraser River, which involves upgrading and integrating an existing dike network. The proposed dike upgrades would be phased as necessary, and would also consider the following: • Access and egress into Colony Farm an

Status
Prospective
Sector
Mass Transit, Hydro, Raw Materials, Rail, Water Supply and Storage, Government
Location
British Columbia, Canada
Updated
19 Nov 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Kwikwetlem First Nation and Coquitlam - Joint Flood Mitigation Program

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Kwikwetlem First Nation and Coquitlam - Joint Flood Mitigation Program” is an infrastructure initiative in the Mass Transit sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

pre-construction

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The City of Coquitlam and k¿ik¿¿¿¿¿m First Nation would like to complete coordinated and shared flood protection improvements along the confluence of the lower Coquitlam River and the Fraser River, which involves upgrading and integrating an existing dike network. The proposed dike upgrades would be phased as necessary, and would also consider the following: • Access and egress into Colony Farm and k¿ik¿¿¿¿¿m lands • Fish habitat improvements • Protection of the k¿ik¿¿¿¿¿m cemetery • Protection of the k¿ik¿¿¿¿¿m transformer stone • Consideration of a proposed new dock/boom at the Fraser River and Coquitlam River confluence • Archaeological investigation • Existing and anticipated siltation within the Coquitlam River; and • Coordination as appropriate with Port Coquitlam, Metro Vancouver, BC Hydro, and CP Railway (considering that the dikes on the east side of the Coquitlam River would not be upgraded as part of this grant application). The physical works would include the following: • Upgraded linear dikes, including armouring adjacent IR#1 where necessary • New linear dikes (if necessary), including consideration of access and egress into Colony Farm Regional Park and k¿ik¿¿¿¿¿m lands • Fish habitat improvements • Upgraded flood box(es) (if necessary)

Original sector

Climate Resilience

Budget

Location

Country

Canada

State

British Columbia

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Mass Transit, Hydro, Raw Materials, Rail, Water Supply and Storage, Government

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project