KY Apple Nexus AMLER Fit-Up
Sector: Power Generation (CCGT) • Location: Prestonsburg, Kentucky, United States of America
Source: Dodge
The work consists of the following: The project consists of tenant fit-up of an existing pre-engineered metal building with office shell, build in 2007, required to outfit as an Apple Processing and Cold Storage Facility for local gown apples. Project involves Civil, Architectural, Structural, Mechanical, Electric, and Plumbing work
- Status
- Closed
- Sector
- Power Generation (CCGT), Warehouse, Manufacturing (Industrial), Consumer Products, Metal, Commercial, Residential
- Location
- Prestonsburg, Kentucky, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about KY Apple Nexus AMLER Fit-Up
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work consists of the following: The project consists of tenant fit-up of an existing pre-engineered metal building with office shell, build in 2007, required to outfit as an Apple Processing and Cold Storage Facility for local gown apples. Project involves Civil, Architectural, Structural, Mechanical, Electric, and Plumbing work |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kentucky |
City | Prestonsburg |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Warehouse, Manufacturing (Industrial), Consumer Products, Metal, Commercial, Residential |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
