KY/DOT: Berry Blvd Asphalt Resurfacing (CO 401)
Closed · Kentucky · Last reported May 2023
Source: Dodge USA
Fd05 056 060A 000-001 : Berry Blvd/7Th Street Road (Us 60A) (Mp 0.000) Begin At Us 31W/Ky 2049 Extending East To 100 Feet East Of Continental Pl (Mp 0.776), A Distance Of 0.77 Miles. Asphalt Resurfacing. Jefferson County Fd05 056 1142 000-002 : Palatka Road (Ky 1142) (Mp 0.635) Begin At Manslick Road Extending East To Ky 907 (Mp 1.736), A Distance Of 1.10 Miles. Asphalt Resurfacing. Jefferson Coun
- Status
- Closed
- Sector
- Consumer Products, Road, Commercial, Manufacturing (Industrial)
- Location
- Louisville, Kentucky, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about KY/DOT: Berry Blvd Asphalt Resurfacing (CO 401)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Fd05 056 060A 000-001 : Berry Blvd/7Th Street Road (Us 60A) (Mp 0.000) Begin At Us 31W/Ky 2049 Extending East To 100 Feet East Of Continental Pl (Mp 0.776), A Distance Of 0.77 Miles. Asphalt Resurfacing. Jefferson County Fd05 056 1142 000-002 : Palatka Road (Ky 1142) (Mp 0.635) Begin At Manslick Road Extending East To Ky 907 (Mp 1.736), A Distance Of 1.10 Miles. Asphalt Resurfacing. Jefferson County Fd05 056 1865 003-006 : New Cut Road (Ky 1865) (Mp 3.010) Begin At Ky 1142 Extending North To ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kentucky |
City | Louisville |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Road, Commercial, Manufacturing (Industrial) |
Article published date | 2023-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
