KY/DOT: Crab Orchard Rd Asphalt Resurfacing(CO317)
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Lincoln County Fd05 069 0039 000-009 : Somerset - Crab Orchard Road (Ky 39) (Mp 0.000) Beginning At The Pulaski/ Lincoln County Line Extending North To The Pavement Joint 0.192 Miles South Of Us 150 (Mp 8.866), A Distance Of 8.86 Miles. Asphalt Resurfacing.
- Status
- Closed
- Sector
- Manufacturing (Industrial), Road, Commercial
- Location
- Stanford, Kentucky, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about KY/DOT: Crab Orchard Rd Asphalt Resurfacing(CO317)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Lincoln County Fd05 069 0039 000-009 : Somerset - Crab Orchard Road (Ky 39) (Mp 0.000) Beginning At The Pulaski/ Lincoln County Line Extending North To The Pavement Joint 0.192 Miles South Of Us 150 (Mp 8.866), A Distance Of 8.86 Miles. Asphalt Resurfacing. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kentucky |
City | Stanford |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Road, Commercial |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
