KY/DOT: Culvert Replacement (CO 347) REBID
Sector: Water Supply and Storage • Location: Vanceburg, Kentucky, United States of America
Source: Dodge USA
Aa Highway (Ky 10) (Mp 13.000) From 1325 Feet East Of Greenbriar Hollow Extending East To 1850 Feet East Of Greenbriar Hollow (Mp 13.100), A Distance Of 0.10 Miles. Culvert Replacement.
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Commercial
- Location
- Vanceburg, Kentucky, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about KY/DOT: Culvert Replacement (CO 347) REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results, Design Development |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Aa Highway (Ky 10) (Mp 13.000) From 1325 Feet East Of Greenbriar Hollow Extending East To 1850 Feet East Of Greenbriar Hollow (Mp 13.100), A Distance Of 0.10 Miles. Culvert Replacement. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kentucky |
City | Vanceburg |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Commercial |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
