KY/DOT: I-264 Watterson Expressway Interchange Reconstructio
Sector: Water Supply and Storage • Location: Louisville, Kentucky, United States of America
Source: Dodge
I-264 The Dbe Participation Goal Is 10.00%. Jefferson County Nh 2641 (176) : I-264 / Us-42 Interchange (Mp 21.0) Reconstruct/widen 1-264(Watterson Expressway) From Westport Road (Ky-1447) To I-71 Including The Us-42 Interchange As A Spui (Mp 22.6), A Distance Of 3.65 Miles. Bridge With Grade, Drain & Surface. Syp No. 05-00804.00. Jefferson County Nhpm 2641 (090) : I-264 (Mp 20.56) Asphalt Resurfac
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Road, Commercial, Bridge, Waste Processing and Treatment
- Location
- Louisville, Kentucky, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about KY/DOT: I-264 Watterson Expressway Interchange Reconstructio
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | I-264 The Dbe Participation Goal Is 10.00%. Jefferson County Nh 2641 (176) : I-264 / Us-42 Interchange (Mp 21.0) Reconstruct/widen 1-264(Watterson Expressway) From Westport Road (Ky-1447) To I-71 Including The Us-42 Interchange As A Spui (Mp 22.6), A Distance Of 3.65 Miles. Bridge With Grade, Drain & Surface. Syp No. 05-00804.00. Jefferson County Nhpm 2641 (090) : I-264 (Mp 20.56) Asphalt Resurfacing On I-264 From Mp 20.590 To Mp 21.280 Eb. & Mp. 20.560 To Mp 21.020 Wb & Mp. 22.590 To Mp 22.8... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kentucky |
City | Louisville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Road, Commercial, Bridge, Waste Processing and Treatment |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
