KY/DOT: I-75 SB High Friction Surface(CO203)
Closed · Kentucky · Last reported Apr 2025
Source: Dodge
Fayette, Jessamine, Madison Counties 059gr25t009-hsip Nicholasville Bypass (Us 27)(Mp 10.685) The Dbe Participation Goal Is 0.00%. Fayette County Hsip 9010(681) : Interstate 75 Sb Ramp 431 (I75 Ramp 431) (Mp 0.00) Hfst On I75 Sb Ramp 431 (I75 Ramp 431) (Mp 0.240), A Distance Of 0.25 Miles. High Friction Surface. Syp No. 07-00991.00. Jessamine County Hsip 9010(701) : Nicholasville Bypass (Us 27)(Mp
- Status
- Closed
- Sector
- Manufacturing (Industrial), Road, Commercial
- Location
- Lexington, Kentucky, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about KY/DOT: I-75 SB High Friction Surface(CO203)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Fayette, Jessamine, Madison Counties 059gr25t009-hsip Nicholasville Bypass (Us 27)(Mp 10.685) The Dbe Participation Goal Is 0.00%. Fayette County Hsip 9010(681) : Interstate 75 Sb Ramp 431 (I75 Ramp 431) (Mp 0.00) Hfst On I75 Sb Ramp 431 (I75 Ramp 431) (Mp 0.240), A Distance Of 0.25 Miles. High Friction Surface. Syp No. 07-00991.00. Jessamine County Hsip 9010(701) : Nicholasville Bypass (Us 27)(Mp 10.685) (Mp 10.685) Hfst On Nicholasville Bypass (Us 27) (Mp 11), A Distance Of 0.32 Miles. High... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kentucky |
City | Lexington |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Road, Commercial |
Article published date | 2025-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
