logo

KY/DOT: KY-251 Roundabout Construction (CO 104)

Sector: Water Supply and Storage • Location: Elizabethtown, Kentucky, United States of America

Source: Dodge USA

Project
Closed

Ky 251/Ky 434 (Mp 6.137) Construction Of Roundabout At Intersection Of Ky-251 At Ky-434 From Mp 6.137 To Mp 6.288 (Mp 6.288), A Distance Of 0.67 Miles. Asphalt Surface With Grade & Drain.

Status
Closed
Sector
Water Supply and Storage, Road, Waste Processing and Treatment, Commercial
Location
Elizabethtown, Kentucky, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about KY/DOT: KY-251 Roundabout Construction (CO 104)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “KY/DOT: KY-251 Roundabout Construction (CO 104)” is an infrastructure initiative in the Water Supply and Storage sector, located in Elizabethtown, Kentucky, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Ky 251/Ky 434 (Mp 6.137) Construction Of Roundabout At Intersection Of Ky-251 At Ky-434 From Mp 6.137 To Mp 6.288 (Mp 6.288), A Distance Of 0.67 Miles. Asphalt Surface With Grade & Drain.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Kentucky

City

Elizabethtown

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Waste Processing and Treatment, Commercial

Article published date

2024-03-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project