KY/DOT: Road Reconstruction
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
IMPROVE ALIGNMENT AND GEOMETRICS OF THE CURVE LOCATED JUST BEFORE THE JUNCTION OF KY-2031 AND KY-40 TO .1 MILES BEFORE GORDON HOLLOW ROAD, AND IMPROVE THE CULVERT/SAFETY DESIGN TO INCREASE MOTORIST AND PEDESTRIAN SAFETY. (12CCR) (2020CCR) Type of Work: RECONSTRUCTION(O) (12CCR) (2020CCR) (2022CCR) (2024C MARTIN KY - 40 18.2 - 18.4
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Road, Commercial
- Location
- Beauty, Kentucky, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about KY/DOT: Road Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | IMPROVE ALIGNMENT AND GEOMETRICS OF THE CURVE LOCATED JUST BEFORE THE JUNCTION OF KY-2031 AND KY-40 TO .1 MILES BEFORE GORDON HOLLOW ROAD, AND IMPROVE THE CULVERT/SAFETY DESIGN TO INCREASE MOTORIST AND PEDESTRIAN SAFETY. (12CCR) (2020CCR) Type of Work: RECONSTRUCTION(O) (12CCR) (2020CCR) (2022CCR) (2024C MARTIN KY - 40 18.2 - 18.4 |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kentucky |
City | Beauty |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Road, Commercial |
Article published date | 2025-01-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
