KY/DOT: US-27 Safety Improvements Phase 1
Sector: Water Supply and Storage • Location: Nicholasville, Kentucky, United States of America
Source: Dodge USA
Safety Improvements - Phase 1: Extend Nb And Sb Left Turn Lanes On The Us 27 Bypass At The Intersection Of Keene Road. Phase 2: Construct A Wb Right Turn Lane From Keene Road Onto Nb Us 27 Bypass, A Distance Of 0.34 Miles. Grade & Drain With Asphalt Surface.
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Road, Mass Transit, Rail
- Location
- Nicholasville, Kentucky, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about KY/DOT: US-27 Safety Improvements Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results, Design Development |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Safety Improvements - Phase 1: Extend Nb And Sb Left Turn Lanes On The Us 27 Bypass At The Intersection Of Keene Road. Phase 2: Construct A Wb Right Turn Lane From Keene Road Onto Nb Us 27 Bypass, A Distance Of 0.34 Miles. Grade & Drain With Asphalt Surface. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kentucky |
City | Nicholasville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Road, Mass Transit, Rail |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
