logo
ProjectClosed

KY/DOT: US 31W Road Improvements (CO 103)

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Us 31w Improve Mobility And Reduce Congestion From Us68 To Mizpah Road, A Distance Of 1.52 Miles. Asphalt Surface With Grade & Drain.

Status
Closed
Sector
Road, Water Supply and Storage, Waste Processing and Treatment, Commercial
Location
Oakland, Kentucky, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about KY/DOT: US 31W Road Improvements (CO 103)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “KY/DOT: US 31W Road Improvements (CO 103)” is an infrastructure initiative in the Road sector, located in Oakland, Kentucky, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Us 31w Improve Mobility And Reduce Congestion From Us68 To Mizpah Road, A Distance Of 1.52 Miles. Asphalt Surface With Grade & Drain.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Kentucky

City

Oakland

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Waste Processing and Treatment, Commercial

Article published date

2024-08-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project