KY/DOT: US 60 Asphalt Surface (CO 401) REBID
Sector: Water Supply and Storage • Location: Marion, Kentucky, United States of America
Source: Dodge USA
Us Highway 60 (Us 60) (Mp 4.90) From Ky 297 Extending East To Old Salem Road (Mp 8.40), A Distance Of 3.50 Miles. Asphalt Surface With Grade & Drain. Syp No. 01-09023.00. Crittenden County Fd04 028 0060 008-009 : Us-60 Widen Us-60 To Provide Turn Lanes At Crittenden County High School And Crittenden Hospital, A Distance Of 0.21 Miles. Asphalt Surface With Grade & Drain. Syp No. 01-80101.00.
- Status
- Closed
- Sector
- Water Supply and Storage, Hospital, Hotel, Road, Waste Processing and Treatment, Commercial
- Location
- Marion, Kentucky, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about KY/DOT: US 60 Asphalt Surface (CO 401) REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results, design development |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Us Highway 60 (Us 60) (Mp 4.90) From Ky 297 Extending East To Old Salem Road (Mp 8.40), A Distance Of 3.50 Miles. Asphalt Surface With Grade & Drain. Syp No. 01-09023.00. Crittenden County Fd04 028 0060 008-009 : Us-60 Widen Us-60 To Provide Turn Lanes At Crittenden County High School And Crittenden Hospital, A Distance Of 0.21 Miles. Asphalt Surface With Grade & Drain. Syp No. 01-80101.00. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kentucky |
City | Marion |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Hospital, Hotel, Road, Waste Processing and Treatment, Commercial |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
