logo

Kyiv Urban Mobility Project

Sector: Mass Transit • Location: Ukraine

Source: World Bank Group

Project
Dropped

The Kyiv Urban Mobility Project will deploy an Investment Project Finance (IPF) loan from IBRD to Ukraine that will be on-lent toKyivpastrans. The project will finance two complementary components. Component 1 “Borshchahivka Rapid Tram extension & VokzalnaSquare enhancement” aims at an achievable and highly important improvement in urban mobility that would build KPT and KCSA’simplementation cap

Project Information FAQ

Project Information

5 Q
The project “Kyiv Urban Mobility Project” is an infrastructure initiative in the Mass Transit sector, located in Ukraine. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

dropped

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Kyiv Urban Mobility Project will deploy an Investment Project Finance (IPF) loan from IBRD to Ukraine that will be on-lent toKyivpastrans. The project will finance two complementary components. Component 1 “Borshchahivka Rapid Tram extension & VokzalnaSquare enhancement” aims at an achievable and highly important improvement in urban mobility that would build KPT and KCSA’simplementation capacity so that larger, more ambitious projects become increasingly within reach. Component 2 “Strengthening Kyiv’stransport planning systems” will finance improvements to KCSA’s capabilities for transport planning. Together these interventionsare meant to prepare KCSA for further initiatives aimed at transforming urban mobility in Kyiv. The project will also include aContingency Emergency Response Component that will initially have a US$ 0 allocation as a standby option for responding toemergency situations if a need arises. Detailed descriptions of each component follow below.Component 1: Borshchahivka RapidTram extension & Vokzalna Square enhancement (US$ 35.91 million)20. The project will extend the Borshchahivka Rapid Tram andupgrade Vokzalna square. Under Component 1, the project would finance extension of the Borshchahivka Rapid Tram from its currentterminus outside of Vokzalna Square with a new station and turning loop within Vokzalna Square and on to a point near Palats Sportumetro station (approximately 3.5 route-km). In parallel, the project will finance an overall masterplan for Vokzalna Square and afirst phase of infrastructure upgrades with a focus on segregating pedestrians from vehicular traffic, improving passenger amenity,and eliminating barriers that affect persons with disabilities. Specific activities that would be financed under Component 1include:As part of the Borshchahivka Rapid Tram extension:i. Field-based utilities validation and a flood risk assessment forBorshchahivka Rapid Tram’s extended alignment;ii. Detailed design and tender documentation for Borshchahivka Rapid Tram extension;andiii. Civil works for the extension of the Borshchahivka Rapid Tram tracks totaling approximately 8 track-km (3.5 km route-km inaddition to a turning loop in Vokzalna Square).As part of the Vokzalna Square upgrade:i. Development of the Vokzalna squaremaster plan and a phasing program for upgrades;ii. Vokzalna Square phase 1 engineering design;iii. Accessible pavers and vehiclewaiting / drop-off areas;iv. Passenger coverings at interchange points;v. Accessibility upgrades along passenger interchanges;andvi. Creation of a passenger amenity area.Elements common to both the Borshchahivka Rapid Tram extension and Vokzalna Squareupgrade:i. Accessibility audits to inform planning, design and post-completion assessment activities; ii. Supervision of civilworks (via a consultancy contract); andiii. Civil works contingency, to be deployed as needed for project delivery.Component 2 -Strengthening Kyiv’s transport planning systems (US$ 1.70 million)This component will finance technical assistance activities tosupport incremental expenses for project delivery and to strengthen KCSA’s transport planning systems. Areas of focus includeupgrades to the Kyiv Urban Mobility Model (i.e. the city’s travel demand model), analytics to inform city-wide public transportfares policy, accessibility standards for common public transport works. Specific items that Component 2 will finance include:i. IT upgrades for KPT, the Urban Development and Architecture Department, and Master Plan Institute;ii. Surveys, genderdisaggregated data collection, and updates to Kyiv’s transport model and master plan;iii. Training and skills development for KPT,the Urban Development and Architecture Dept., and Master Plan Institute;iv. The development of a revised fares policy for KyivPublic Transport;v. The development of accessibility design guidelines for public transport works that meet "Design for All"principles;vi. Consultancy support for KPT and other entities with responsibility for project implementation;vii. Mobilization ofadditional public reporting for transport systems in Kyiv; andviii. Procurement and financial management support forKPT.Contingent Emergency Response (IBRD US$ 0 million):This zero-dollar component is designed to provide swift response in theevent of an eligible crisis or emergency, by enabling the Government of Ukraine to request the World Bank to reallocate projectfunds to support emergency response and reconstruction. An Emergency Response Manual (“ERM”) shall be prepared by KCSA, which willspecify implementation arrangements for the component, including its activation process, roles and responsibilities of implementingagencies, a positive list of activities that may be financed, environmental and social aspects, and fiduciary arrangements.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data