logo
ProjectClosed

KYOYA Office / SAKUMAESHIMA

Closed · Last reported Feb 2024

Source: ArchDaily

Text description provided by the architects.This is an Interior design project for the relocation of the new office building of KYOYA Corporation, which is a long-established company founded in 1928 that provides promotion, interior design, and display services. This project site is located in an area dotted with fashion brand offices, a short walk from JR Harajuku Station in the Sendagaya directi

Status
Closed
Sector
Residential, Commercial, Government
Updated
22 Jul 2026
Source
ArchDaily

ConstructChat

Ask ConstructChat about KYOYA Office / SAKUMAESHIMA

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “KYOYA Office / SAKUMAESHIMA” is an infrastructure initiative in the Residential sector. Taiyo aggregates data on it from ArchDaily.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Text description provided by the architects.This is an Interior design project for the relocation of the new office building of KYOYA Corporation, which is a long-established company founded in 1928 that provides promotion, interior design, and display services. This project site is located in an area dotted with fashion brand offices, a short walk from JR Harajuku Station in the Sendagaya direction. The project utilizes an existing building with one basement floor and three stories above ground. The building was originally a vocational school and was converted into office space, a showroom, and rental space.The second and third floors are used for office functions. While making the most of the existing conditions on each floor, large tables were arranged as much as possible to match the layout of each floor. This made it possible to realize the work style that each department was aiming for. The tables are made of linden plywood, and the fixtures that house the existing locker system are also made of linden plywood.There are two entrances: one on the basement level, where the showroom and rental space are located, and the other on the first floor, where meetings with visitors are held. Although the building has an opening on the south side, the upper floors of the building receive more natural light due to the presence of many buildings in the surrounding area. The basement floor is made of granite and also receives no natural light. Curtain rails were installed in front of the entrance to separate the space with curtains in order to allow the floor with its unique atmosphere to be used flexibly. The key color is silver, which is suitable for all kinds of uses but does not create a heavy atmosphere.For the first floor, the entrance opening, which previously had a wooden deck, was replaced with a sliding glass door, and a conference room separated by a glass partition was placed in the center of the floor, allowing natural light to penetrate as far as possible to the back of the floor, while allowing the selection of meeting locations based on the level of confidentiality. The area at the far end can also be separated by curtains, allowing it to be used as a work area, meeting room, or storage area.

Location

Not available for this record.

Source

Source

ArchDaily

URL

More Details

Record type

Project

Sector

Residential, Commercial, Government

Article published date

2025-06-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project