logo
ProjectActive

Kyrgyz Republic Air Quality Improvement Project

Active · Kyrgyz Republic

Source: World Bank Group

The development objective of Air Quality Improvement Project for Kyrgyz Republic is to i) strengthen the capacity of the Kyrgyz Republic to manage air quality; and ii) reduce net PM2.5 and Greenhouse Gas (GHG) emissions in Bishkek. This project has four components. 1) Strengthen Air Quality Management System, has the following components: (i) Enhancing Ambient AQ Data Collection, Analysis, and Dis

Status
Prospective
Sector
Water Supply and Storage, Waste Processing and Treatment, Raw Materials, Government, Residential
Location
Kyrgyzstan
Updated
19 Nov 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Kyrgyz Republic Air Quality Improvement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Kyrgyz Republic Air Quality Improvement Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Kyrgyz Republic. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The development objective of Air Quality Improvement Project for Kyrgyz Republic is to i) strengthen the capacity of the Kyrgyz Republic to manage air quality; and ii) reduce net PM2.5 and Greenhouse Gas (GHG) emissions in Bishkek. This project has four components. 1) Strengthen Air Quality Management System, has the following components: (i) Enhancing Ambient AQ Data Collection, Analysis, and Dissemination; and (ii) Enhancing AQ Management and Pollution Control. 2) The second component, Support the adoption of clean heating solutions, has the following sub-components: (i) Establishment of a revolving mechanizm, to provide Subsidiary Loans to PFIs for provision of Sub-loans to Beneficiaries to carry out Sub-projects; and (ii) Supporting adoption of clean heating. 3) The third component, Improve Urban Greening, has the following sub-components: (i) Supporting measures to preserve and expand urban green cover in Bishkek, including creating green belts to mitigate the impacts of windblown dust; (ii) Construction of irrigation system to ensure sustainability of urban green in Bishkek; and (iii) Strengthening institutional capacity of the municipal greening and irrigation agencies in Bishkek. 4) The fourth component, Project Implementation Support, aims to support project implementation through provision of adequate funds for the Ministry of Natural Resources, Ecology, and Technical Supervision (MNRETS) Project Implementing Unit (PIU) and Ministry of Finance (MoF) PIU operations.

Original sector

FY17 - Agriculture, Fishing and Forestry,FY17 - Energy and Extractives,FY17 - Public Administration

Budget

Location

Country

Kyrgyzstan

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Raw Materials, Government, Residential

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project