Kyrgyz Republic Air Quality Improvement Project
Active · Kyrgyz Republic
Source: World Bank Group
The development objective of Air Quality Improvement Project for Kyrgyz Republic is to i) strengthen the capacity of the Kyrgyz Republic to manage air quality; and ii) reduce net PM2.5 and Greenhouse Gas (GHG) emissions in Bishkek. This project has four components. 1) Strengthen Air Quality Management System, has the following components: (i) Enhancing Ambient AQ Data Collection, Analysis, and Dis
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Raw Materials, Government, Residential
- Location
- Kyrgyzstan
- Updated
- 19 Nov 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Kyrgyz Republic Air Quality Improvement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The development objective of Air Quality Improvement Project for Kyrgyz Republic is to i) strengthen the capacity of the Kyrgyz Republic to manage air quality; and ii) reduce net PM2.5 and Greenhouse Gas (GHG) emissions in Bishkek. This project has four components. 1) Strengthen Air Quality Management System, has the following components: (i) Enhancing Ambient AQ Data Collection, Analysis, and Dissemination; and (ii) Enhancing AQ Management and Pollution Control. 2) The second component, Support the adoption of clean heating solutions, has the following sub-components: (i) Establishment of a revolving mechanizm, to provide Subsidiary Loans to PFIs for provision of Sub-loans to Beneficiaries to carry out Sub-projects; and (ii) Supporting adoption of clean heating. 3) The third component, Improve Urban Greening, has the following sub-components: (i) Supporting measures to preserve and expand urban green cover in Bishkek, including creating green belts to mitigate the impacts of windblown dust; (ii) Construction of irrigation system to ensure sustainability of urban green in Bishkek; and (iii) Strengthening institutional capacity of the municipal greening and irrigation agencies in Bishkek. 4) The fourth component, Project Implementation Support, aims to support project implementation through provision of adequate funds for the Ministry of Natural Resources, Ecology, and Technical Supervision (MNRETS) Project Implementing Unit (PIU) and Ministry of Finance (MoF) PIU operations. |
Original sector | FY17 - Agriculture, Fishing and Forestry,FY17 - Energy and Extractives,FY17 - Public Administration |
Budget |
Location
Country | Kyrgyzstan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Raw Materials, Government, Residential |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
