Kyrgyz Solar 2
Active · Kyrgyz Republic
Source: International Finance Corporation (IFC)
IFC Advisory will assist the Kyrgyz Republic in attracting private sector participation to the power sector. The PPP contract(s) will include the design, construction, financing, and operation of up to two solar PV Plants with a combined capacity of up to 300MW. IFC will apply a two-phased transaction implementation approach. In Phase 1, IFC will carry out due diligence analysis of the project, as
- Status
- Prospective
- Sector
- Power Generation (CCGT), Solar, Government
- Location
- Kyrgyzstan
- Updated
- 19 Nov 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about Kyrgyz Solar 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | IFC Advisory will assist the Kyrgyz Republic in attracting private sector participation to the power sector. The PPP contract(s) will include the design, construction, financing, and operation of up to two solar PV Plants with a combined capacity of up to 300MW. IFC will apply a two-phased transaction implementation approach. In Phase 1, IFC will carry out due diligence analysis of the project, assessment of investors’ interest, and the transaction structuring. In Phase 2, IFC will draft the tender documentation and support the Kyrgyz Republic with the implementation and conclusion of a competitive tender process. This is the second tender to be implemented as part of this Project which will, in total, cover up to 500 MW of solar capacity. |
Procurement method |
Location
Country | Kyrgyzstan |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Solar, Government |
Article published date | 2025-08-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
