Kyrgyzstan: Water Supply and Sanitation Universal Access Project
The status, timeline and source of this project. A free account opens every field.
Source: Asian Infrastructure Investment Bank (AIIB)
The Project is proposed to be part of the Water Supply and Sanitation Universal Access Program, designed and co- financed with the World Bank (WB) under a Multiphase Programmatic Approach (MPA) to provide universal access and improve the sustainability of water supply and sanitation services in the Kyrgyz Republic, through three progressive phases. Phase 1 of the WB Program (the Project) will be j
- Status
- Prospective
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Hospital, Raw Materials, Education, Residential, Commercial, Government
- Location
- Kyrgyzstan
- Updated
- 22 Jul 2026
- Source
- Asian Infrastructure Investment Bank (AIIB)
ConstructChat
Ask ConstructChat about Kyrgyzstan: Water Supply and Sanitation Universal Access Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | approved |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project is proposed to be part of the Water Supply and Sanitation Universal Access Program, designed and co- financed with the World Bank (WB) under a Multiphase Programmatic Approach (MPA) to provide universal access and improve the sustainability of water supply and sanitation services in the Kyrgyz Republic, through three progressive phases. Phase 1 of the WB Program (the Project) will be jointly co-financed by AIIB and WB, with AIIB providing loan to Component 1 for the construction and upgrade of water supply infrastructure with climate-resilient features and priority improvements to on-site sanitation for households and public institutions (schools, hospitals, etc.) and technical assistance, in around 126 rural villages and small towns in Chui, Issyk-Kul, and Osh regions, benefitting around 450,000 people. The Project is planned to have five components as described below: Component 1. Water Supply Investments; Component 2. Sanitation Development; Component 3. Performance-based Service Improvement; Component 4. Program Structuring and Management and Institutional Development Support; and Component 5. Contingent Emergency Response. In addition to the proposed sovereign-backed loan to finance Component 1, AIIB has approved a Project Preparation Special Fund (PPSF) grant of USD 4 million to support the subproject preparation and early implementation under the Project. Through the PPSF grant, AIIB will support the detailed design of subproject with climate mitigation and resilience features, E&S baseline survey and institutional development, to enhance technical readiness and ensure high level of E&S safeguards throughout the envisaged PPSF support to project preparation. AIIB's participation and support in the Project also aim to promote the long-term sustainable development of the Water Supply and Sanitation Sector of the Kyrgyz Republic. |
Original sector | Water |
Budget |
Location
Country | Kyrgyzstan |
Source
Source | Asian Infrastructure Investment Bank (AIIB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Hospital, Raw Materials, Education, Residential, Commercial, Government |
Article published date | 2025-12-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Kyrgyzstan
- WATER SUPPLY SEWERAGE AND SOLID WASTE
- Osh-Batken-Isfana Road restoration, Tortkul Reservoir - Ak Tatyr Section
- Kyrgyzstan: Enabling the Green and Sustainable Transition and Climate Resilience of MSMEs
- Kyrgyzstan: Developing a Sustainable Finance Market for Micro-, Small-, or Medium Enterprises (MSMEs) Project
- Water Supply System in Soviet Village
- Spring Water Collection and Pipeline in Kara-Bulak
- Karakol Wastewater Treatment Facilities Construction
- Rehabilitation of Water Supply and Sewerage Systems in the City of Naryn (Phase II)
