logo

Kyzyl Project

Sector: Power Generation (CCGT) • Location: Kazakhstan

Source: European Bank for Reconstruction and Development (EBRD)

Project
Repaying

A USD140 million loan to Bakyrchik Mining Venture LLP (the "Borrower", "Company"), an entity 100% controlled by Polymetal International Plc (the "Sponsor"), to finance development of the Kyzyl (Bakyrchik) gold deposit (the "Project"). The loan is fully guaranteed by the Sponsor. A Project Summary Document is available for this project. 1. Executive Summary: English | Russian | Kazakh 2. Supplement

Project Information FAQ

Project Information

4 Q
The project “Kyzyl Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Kazakhstan. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

repaying

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

A USD140 million loan to Bakyrchik Mining Venture LLP (the "Borrower", "Company"), an entity 100% controlled by Polymetal International Plc (the "Sponsor"), to finance development of the Kyzyl (Bakyrchik) gold deposit (the "Project"). The loan is fully guaranteed by the Sponsor. A Project Summary Document is available for this project. 1. Executive Summary: English | Russian | Kazakh 2. Supplementary Environmental & Social Report (2016) with Appendices: English | Russian | Kazakh 3. Environmental and Social Impact Assessment (2015) with Appendices and Drawings: English | Russian | Kazakh 4. Environmental and Social Management Plans: English| Russian | Kazakh 5. Non-Technical Summary (NTS): English | Russian | Kazakh 6. Draft Environmental and Social Action Plan (ESAP): English | Russian | Kazakh 7. Stakeholder Engagement Plan: English | Russian | Kazakh 8.  Final Environmental and Social Action Plan (ESAP): English | Russian | Kazakh Full ESIA documentation is available locally at: And And http://www.polymetal.ru/sustainable-development/environment/esia.aspx?sc_lang=en http://www.garma.vko.gov.kz/ru/ Environmental or social enquiries General enquiries Contact Name: Magasha Saiduakassova, Saiduakassova@polymetal.Kz Address: Auezov village, Zharma area, East Kazakhstan region, 070605, Republic of Kazakhstan Telephone: +7 (723) 249 26 00

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data