logo

Kyzylorda CNG Bus

Sector: Government • Location: Kazakhstan

Source: European Bank for Reconstruction and Development (EBRD)

Project
Complete

Translated version of this PSD: Russian EBRD is considering assisting the City of Kyzylorda (the “City”) in reforming the regulatory framework for bus service provision. The project will focus on the improvement of public bus service standards in the city through the establishment of a new tender regime, which will equalise the operating environment revenue-wise for all operators. This will be ach

Project Information FAQ

Project Information

4 Q
The project “Kyzylorda CNG Bus” is an infrastructure initiative in the Government sector, located in Kazakhstan. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Translated version of this PSD: Russian EBRD is considering assisting the City of Kyzylorda (the “City”) in reforming the regulatory framework for bus service provision. The project will focus on the improvement of public bus service standards in the city through the establishment of a new tender regime, which will equalise the operating environment revenue-wise for all operators. This will be achieved through the signing of Public Service Contracts (“PSC”) and the development of the integrated ticketing system. EBRD will consider a senior loan to a newly established municipally-owned public transport dispatch and operating company, LLP Avtobusnyi Park Kyzylorda (the “Company”), of up to USD 18.8 million (or KZT equivalent) under a project support agreement with the SPK “Baikonur” and the Oblast of Kyzylorda. The financing is envisaged to be used for the acquisition of up to 100 new compressed natural gas (“CNG”) buses to be operated under the PSC. The Company will be responsible for organising bus service provision, introduction and operation of a formal fare collection system as well as fleet and depot. Additionally, the Project aims at setting standards for service quality in public transport. The project will establish a sound and transparent institutional framework for tendering bus services to the market with a view to introducing effective competition between urban transport operators (both public and private). The Bank’s project will create solid financial and operational conditions for the operators and will facilitate much-needed efficiency improvements in the provision of public transport services. It will also promote long-term, non-recourse financing of the public transport investments, and introduce incentive-based PSCs. The project will introduce CNG buses, which will significantly reduce CO2 emissions and will significantly improve urban transport services in terms of increasing reliability of service, providing more capacity and integrating different urban transport modes, operators and ticketing. The transaction will introduce appropriate corporate governance standards with the Company. It will set up a new concept of accountability for quality and quantity of the public transport services as well as formalise the system of institutional, accounting and managerial control in the sector. Avtobusnyi Park Kyzylorda, a municipal dispatch and operating company, wholly owned by the Akimat of Kyzylorda Oblast. A senior loan of up to USD 18.8 million (or KZT equivalent). Up to USD 26.8 million. Categorised B in accordance with EBRD's 2008 Environmental and Social Policy. The modernisation of the bus fleet through introduction of low floor CNG buses compliant with Euro IV-VI standard will have mainly positive environmental and social impacts. The project will contribute to improving air quality in the City of Kyzylorda, reduce passenger congestion and improve overall quality and efficiency of urban transportation. The environmental and social due diligence is on-going and will include a review of the Company's environmental and social management systems, facilities and operations, as well as envisaged priority investments for compliance with the Bank’s Performance Requirements (PRs). The Environmental and Social Action Plan (ESAP) will be developed to address any environmental and social issues identified during the due diligence to achieve and maintain compliance with the Bank's PRs within a reasonable time-frame. The Company will also develop a Stakeholder Engagement Plan, including a grievance mechanism, and will release information on environmental and social performance and a summary of the agreed Action Plan to stakeholders. This PSD will be updated when the results of due diligence are known. The following technical co-operation (“TC”) assignments are a part of this project: Pre Loan Signing Post Loan Signing

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data