Kyzylorda-Zhezkazgan Road Reconstruction
Sector: Road • Location: Kazakhstan
Source: European Bank for Reconstruction and Development (EBRD)
The provision of finance of up to USD 240 million in local currency split into two tranches under sovereign guarantee to JSC KazAvtoZhol, 100 per cent state-owned national road operator. The first tranche in the amount equivalent to USD 187.4 million in local currency will finance the reconstruction of a 204 km long road section between the cities of Kyzylorda and Zhezkazgan. The second uncommit
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | disbursing |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The provision of finance of up to USD 240 million in local currency split into two tranches under sovereign guarantee to JSC KazAvtoZhol, 100 per cent state-owned national road operator. The first tranche in the amount equivalent to USD 187.4 million in local currency will finance the reconstruction of a 204 km long road section between the cities of Kyzylorda and Zhezkazgan. The second uncommitted tranche of USD 52.6 million will finance construction of a 14.8 km bypass around Kyzylorda, adjacent to the motorway. The proposed investments include construction of the a greenfield 14.8 km bypass around Kyzylorda, which the EBRD has assigned it a Category A, that means that a comprehensive Environmental and Social Impact Assessment (ESIA) and review of associated documents must be carried out, followed by their public disclosure for a minimum period of 120 days. 1. Environmental and Social Impact Assessment in English and Russian (July 2021) Download zip file of ESIA 2. Non-Technical Summary (NTS) in English and Russian (July 2021) Download zip file of NTS 3. Stakeholder Engagement Plan (SEP) in English and Russian (July 2021) Download zip file of SEP 4. Environmental and Social Action Plan (ESAP) in English and Russian (July 2021) Download zip file of ESAP 5. Environmental and Social Management Plan (ESMP) in English and Russian (July 2021) Download zip file of ESMP Full ESIA documentation is available locally at: Garyshzhan Nagmanov, Manager of the first category of Loan Management, JSC KazAutoZhol Phone: +7-701-055-06-55 Nur-Sultan, Kunayev Str. 10, Emerald Towers Business Centre, 34 floor Email: garyshzhan.nagmanov@qaj.kz And EBRD Resident Office in Nur-Sultan 2, Dostyk street Saad Business Centre 010000 Nur-Sultan Kazakhstan Tel. +7 7172 554246 Fax.: +7 7172 554245 E-mail: AstanaRO@ebrd.com And Website Environmental or social enquiries Garyshzhan Nagmanov, Manager of the first category of Loan Management, JSC KazAutoZhol Phone: +7-701-055-06-55 Nur-Sultan, Kunayev Str. 10, Emerald Towers Business Centre, 34 floor Email: garyshzhan.nagmanov@qaj.kz |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
