L Taraval Improvement Project

Sector: Automotive • Location: San Francisco, California, United States of America

Source: SFMTA Projects

Project
Current

L Taraval Improvement Project Share this: Facebook Twitter LinkedIn SFMTA.com/LTaravalProject Project Introduction Segment B construction! The L Taraval Improvement Project's current updates and forecasts. More information is available within the project updates The Overhead Contact System installation is scheduled to begin October 22 from 10 p.m. to 5 a.m. Interactive bus reroutes maps are availa

Project Information FAQ

Project Information

4 Q
The project “L Taraval Improvement Project” is an infrastructure initiative in the Automotive sector, located in San Francisco, California, United States of America. Taiyo aggregates data on it from SFMTA Projects.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

current

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

L Taraval Improvement Project Share this: Facebook Twitter LinkedIn SFMTA.com/LTaravalProject Project Introduction Segment B construction! The L Taraval Improvement Project's current updates and forecasts. More information is available within the project updates The Overhead Contact System installation is scheduled to begin October 22 from 10 p.m. to 5 a.m. Interactive bus reroutes maps are available with temporary bus stop relocations during construction: https://www.sfmta.com/travel-updates/temporary-stop-relocations L Taraval Improvement Project The L Taraval Improvement project is a multi-agency collaboration with the San Francisco Public Utilities Commission and the Department of Public Works to improve and upgrade the vital system that will support the community to thrive. The corridor will get the much-needed improvements to the aging infrastructure to make pedestrian crossing safer, increase accessibility, improve transit reliability, rehabilitate water and sewer infrastructure, enhance landscaping and replace road pavement along the L Taraval line. Construction for the L Taraval Improvement Project started in 2019. To reduce the impacts on the community, the project was split into two segments A and B. Segment A started in 2019 and was completed in the summer of 2021. Completed on time and on budget. Segment B began in January 2022 and is expected to be completed in the fall of 2024. Once completed, the corridor will boast new transit priority traffic signals, bulbouts to make pedestrian crossing safer, new trees, high visibility crosswalks, safety boarding islands and increased accessibility. All of these changes will make Taraval more inviting for everyone that uses it. Project Purpose This project is a safety improvement project designed to address the concerns of residents and riders of the L Taraval who find boarding and alighting the train dangerous. Taraval Street, a high injury corridor with a ridership of 30,000 trips daily on the L Taraval, is a Vision Zero priority project that will improve the safety of the street and eliminate preventable collisions and injuries. It will undergo comprehensive changes to feature safety components and bring much needed upgrades to the aging infrastructure. Project Benefits Transit priority traffic signals for more efficient and time saving Muni trips Sidewalk bulbouts for safer pedestrian crossing and higher visibility Enhanced sidewalks to draw visibility to pedestrian crossing at Taraval intersections Safety boarding islands for safer boarding and alighting of Muni L Taraval customers Infrastructure rehabilitation and replacement of worn rails, overhead wires, water and sewer lines, and repavement of the entire Taraval street due to heavy usage from both cars and light rail vehicles (LRV) Infrastructure upgrades will result in less rocking for riders on board the train and rails are less noisy for other vehicles when driven over Sewer and water line replacement will allow for longevity of the utility pipes as well as easier access and less disruptive utility work in the future The streetscape style elements include tree selection, decorative crosswalks, trackway accent colors and public art All of these changes will make Taraval more inviting for everyone that lives or travels there. For project updates and work forecasts: please sign up for email updates L Taraval Improvement Project Details L Taraval Improvement Project - Segment B L Taraval Improvement Project - Segment A Community Outreach Project Timeline 2014 - 2017 Design and community outreach Completed 2017 Early implementation and loading zone pilot Completed 2019 - 2021 Construction Seg A Pending 2022 - 2024 Construction Seg B Pending Cost Estimate $90 Million Current Phase or Stage Construction Predicted Completion Segment B: Fall 2024 Project Status Implementation / Construction Current Project Success On budget On schedule Improvements Boarding Islands Key Stop Ramps at Boarding Islands New Trees and Streetscape Elements Transit Only Lanes Updated Traffic Signals and Crosswalks Bus Routes and Rail Lines L Taraval (Suspended) L Owl L Taraval Bus Neighborhoods West of Twin Peaks Parkside Streets Taraval Street Construction Segments In order to minimize disruptions during construction and maximize flexibility, the project is split into two construction segments.  there will be bus substitutions for the L Taraval so that crews can work on the rails and infrastructure beneath them. Segment A : San Francisco Zoo to Sunset Boulevard Segment B: Sunset Boulevard to West Portal Construction Project Elements Rail track and overhead line replacement Water and sewer line replacement Surface repaving Curb ramp upgrades Concrete boarding islands and pedestrian bulbs Traffic signals New trees and landscaping The streetscape style elements including tree selection, decorative crosswalks, trackway accent colors, public art was based on community feedback and will make the corridor even more inviting to residents and visitors alike. Project Details, History or Features Taraval History and the L Taraval Line The L Taraval has been in service since 1919 and is a vital part of the corridor. Taraval Street itself is both a commercial district with approximately 205 businesses as well as a residential corridor with some 27,200 people living within a one-quarter mile radius of the commercial area. Overhead Contact System (OCS) Poles As part of the project's work to upgrade the corridor's aging infrastructure, new overhead contact system (OCS) pole foundations will be constructed to replace the existing poles. These poles are essential to providing support and tension for Muni's Overhead Contact System to keep the L Taraval light rail vehicles running. In addition, it also serves the dual function of illuminating the streets of the Taraval corridor and the path of travel for the Muni L Taraval. The new OCS poles will be approximately 2-3 feet to the left or right of the existing pole. During construction, you may see both the new and existing OCS poles. This is temporary until the construction crew is able to remove the aged OCS pole. Contact Information Sevilla Mann LTaravalProject@SFMTA.com 415.646.4771

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data