logo

L10-CCS

Sector: Natural Gas • Location: Netherlands

Source: EU Funding & Tenders Portal

Project
Ongoing

The project contributes to the implementation of the Project of Common European Interest (PCI) 13.2 ‘Aramis’, which concerns the construction of CO2 transport infrastructure consisting of a trunkline system (~200 km length) connected to a shipping terminal with buffer storage facilities and other CO2 transport infrastructure facilities in the Netherlands. The Aramis project envisages a new high-ca

Project Information FAQ

Project Information

3 Q
The project “L10-CCS” is an infrastructure initiative in the Natural Gas sector, located in Netherlands. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project contributes to the implementation of the Project of Common European Interest (PCI) 13.2 ‘Aramis’, which concerns the construction of CO2 transport infrastructure consisting of a trunkline system (~200 km length) connected to a shipping terminal with buffer storage facilities and other CO2 transport infrastructure facilities in the Netherlands. The Aramis project envisages a new high-capacity trunkline (22 Mt/y) to transport CO2 from the Port of Rotterdam to the geological storage sites that are located on the Dutch Continental Shelf. The first phase of the Aramis project will be designed for a minimum of 7.5 Mt/y capacity, with the potential to scale up in steps to 22 Mt/y total capacity. This CEF-funded project comprises the detailed design, purchase of material and construction of the L10-R Hub Platform, which is a CO2 storage linked to Aramis, unmanned platform located on the Dutch continental shelf of the North Sea, containing several depleted natural gas fields and construction of an offshore spurline (approx. 23 km 20’’ carbon steel offshore pipeline connecting the Aramis Distribution Hub Platform to the new L10-R Hub Platform). Upon completion of the project (also including not covered by CEF grant new additional injection wells) the CO2 storage facility at the L10-R platform will be ready to enter into operation with a starting storage capacity of 2 Mt/y of CO2.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data