logo
ProjectOngoing

L10-CCS

Ongoing · Netherlands

Source: EU Funding & Tenders Portal

The project contributes to the implementation of the Project of Common European Interest (PCI) 13.2 ‘Aramis’, which concerns the construction of CO2 transport infrastructure consisting of a trunkline system (~200 km length) connected to a shipping terminal with buffer storage facilities and other CO2 transport infrastructure facilities in the Netherlands. The Aramis project envisages a new high-ca

Status
Under Construction
Sector
Natural Gas, Steel, Road, Metal
Location
Netherlands
Updated
22 Jul 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about L10-CCS

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “L10-CCS” is an infrastructure initiative in the Natural Gas sector, located in Netherlands. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Not available for this record.

Status

Original status

ongoing

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project contributes to the implementation of the Project of Common European Interest (PCI) 13.2 ‘Aramis’, which concerns the construction of CO2 transport infrastructure consisting of a trunkline system (~200 km length) connected to a shipping terminal with buffer storage facilities and other CO2 transport infrastructure facilities in the Netherlands. The Aramis project envisages a new high-capacity trunkline (22 Mt/y) to transport CO2 from the Port of Rotterdam to the geological storage sites that are located on the Dutch Continental Shelf. The first phase of the Aramis project will be designed for a minimum of 7.5 Mt/y capacity, with the potential to scale up in steps to 22 Mt/y total capacity. This CEF-funded project comprises the detailed design, purchase of material and construction of the L10-R Hub Platform, which is a CO2 storage linked to Aramis, unmanned platform located on the Dutch continental shelf of the North Sea, containing several depleted natural gas fields and construction of an offshore spurline (approx. 23 km 20’’ carbon steel offshore pipeline connecting the Aramis Distribution Hub Platform to the new L10-R Hub Platform). Upon completion of the project (also including not covered by CEF grant new additional injection wells) the CO2 storage facility at the L10-R platform will be ready to enter into operation with a starting storage capacity of 2 Mt/y of CO2.

Location

Country

Netherlands

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Sector

Natural Gas, Steel, Road, Metal

Article published date

2026-01-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project