L3 Technologies Bldg E-1 Lab Build Out
Sector: Commercial • Location: Salt Lake City, Utah, United States of America
Source: Dodge USA
demolition and remodeling of a project area of approximately 800 square feet of office space. Within this project area there will be 2 rooms remodeled to meet ICD 705 and TEMPEST build standards and some finishing work performed to an already demolished surrounding hallway. All remodeled areas will be brought up to current building standards and codes
- Status
- Closed
- Sector
- Commercial, Residential, Manufacturing (Industrial)
- Location
- Salt Lake City, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about L3 Technologies Bldg E-1 Lab Build Out
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | demolition and remodeling of a project area of approximately 800 square feet of office space. Within this project area there will be 2 rooms remodeled to meet ICD 705 and TEMPEST build standards and some finishing work performed to an already demolished surrounding hallway. All remodeled areas will be brought up to current building standards and codes |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | Salt Lake City |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Residential, Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
